window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Sunday , January 26 2020
GECU MTG PRECUAL 2020 728X90
Mountains 728
ENTERPRISE 728
Rugby Coming Soon 728
Utep Football Generic 728
West Texas Test Drive 728
EPCON_2020 728
Rhinos 2019/2020 728
Amy’s Ambassadorship
Home | News | Connect10, TxDoT closures, detours for Thanksgiving Week

Connect10, TxDoT closures, detours for Thanksgiving Week

Holiday travelers won’t encounter any new road closures as part of the I-10 Connect Project during the week of Thanksgiving, additionally TxDoT contractors will not be working through the Thanksgiving holiday so expect closures only until Wednesday. They’ll pick up again the following week.

However, many on-going traffic impacts, including the long-term detour of ramps from Interstate 10 to Juárez and lane shifts on I-10 under US 54, will remain in place.

Overnight and short-term closures will be suspended until Monday, December 2.

Also, a complete closure of US 54 between I-10 and Loop 375, previously scheduled for the morning of Sunday, November 24, has been cancelled.

Links to full lists of closures:West Area Projects   |   I-10 Connect   |    East Area Projects

The following long-term closures will continue without interruption:

  • Ramps F and G, which connect I-10 to Juárez at the Spaghetti Bowl, remain detoured through northbound US 54 to Pershing Drive until further notice.
  • Ramp T, which connects Gateway Boulevard North to northbound US 54 north of US 62 (Paisano Drive), remains closed until further notice.
  • Both turnarounds under US 54 at US 62 (Paisano Drive) remain closed until further notice.
  • Intermittent lane closures will be in place on US 54 between Loop 375 and Spur 601.
  • Intermittent lane closures will be in place on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Lane closures will be in place on eastbound and westbound SH 20 (Alameda Avenue) at US 54 until further notice.
  • Lane closures will be in place on eastbound and westbound US 62 (Paisano Drive) between I-110 and US 54 until further notice.
  • Lane closures will be in place on Ramp D, which connects southbound US 54 to eastbound I-10 until further notice.
  • Lane closures will be in place on Gateway Boulevard South between Findley Avenue and US 62 (Paisano Drive) until further notice.

Onramp and offramp closures may begin up to one hour earlier than stated times. All information is subject to change based upon weather and field conditions.

The following on-going intermittent closures will resume on Monday, December 2:

  • Intermittent closures of the onramp which connects Gateway Boulevard East to eastbound I-10 at Loop
  • 478 (Copia Street).
  • Intermittent closures on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Intermittent closures on Gateway Boulevard West between Boone Street and Palm Street.
  • Intermittent closures of Durazno Avenue, Rosa Avenue and Uva Street.
  • Intermittent lane closures on Ramp H which connects eastbound I-10 to northbound US 54.

 

Monday, December 2, from 9am to 4pm

  • Onramp from Gateway Boulevard South to southbound US 54 north of Pershing Drive will be closed to all traffic.
  • DETOUR: Continue on Gateway South, enter US 54 south of Pershing.

Crews will be working on foundations of an overhead sign structure.

Monday, December 2, through Thursday, December 5

Nightly from 9pm to 5am

 

  • SH 20 (Alameda Avenue) will be closed to all traffic under US 54.
  • DETOURS: Westbound traffic will continue on US 62 (Paisano Drive) and turn right on Loop 478 (Copia Street) to Alameda. Eastbound traffic will turn left on Loop 478 (Copia Street), right on Gateway Boulevard East and right on Raynolds Street.

Crews will be working on columns for a new ramp.

Monday, December 2, through Sunday, December 8

Non-stop closure

  • Ramp E which connects Gateway Boulevard South to southbound US 54 at Yandell Drive will be closed to all traffic.
  • DETOUR: Enter southbound US 54 south of Pershing Drive.

Crews will be completing electrical work.

Monday, December 2, through Saturday, December 7

Daily from 9am to 4pm

  • Boone Street will be closed to all traffic between Yandell Drive and Gateway Boulevard West

Crews will be removing a crane.

Tuesday, December 3, from 9pm to 5am

  • US 54 will be reduced to a single southbound lane between Spur 601 and Pershing Drive.
  • Onramp from Gateway Boulevard South to southbound US 54 at Cassidy Road will be closed to all traffic.
  • DETOUR: Continue on Gateway South, enter southbound US 54 at Pershing Drive.

Crews will be drilling shafts for an overhead sign structure.

About Staff Report

Staff Reports are just that, Staff Reporting the news. No skew, no opinion just the news. We pride ourselves on making sure that we bring you the news as soon as it is published, submitted or sent to us. No need to have a reporter rewrite or give their opinion. The facts or information, nothing more.

Check Also

WBAMC–TTUHSC El Paso Orthopaedic Resident honored for Research

A research study led by Capt. Spencer Schulte, M.D., a resident in the William Beaumont …

GECU MTG PRECUAL 2020 728X90
EPCON_2020 728
Amy’s Ambassadorship
West Texas Test Drive 728
ENTERPRISE 728
Rhinos 2019/2020 728
Rugby Coming Soon 728
Mountains 728
Utep Football Generic 728