window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Monday , November 11 2019
Utep Football Generic 728
Rhinos 2019/2020 728
Rugby Coming Soon 728
Mountains 728
Towntalk Teaser 728
Bordertown Undergroun Show 728
STEP 728
Amy’s Ambassadorship
Home | News | Local News | Go10/TxDoT Closures, Detours for Week of November 25

Go10/TxDoT Closures, Detours for Week of November 25

There are a couple of activities to watch for on GO 10 this week.  First off the changes to traffic lane patterns may be coming to the exit ramps at North Mesa.

Crews continue to try to open more traffic lanes on the Sunland Park Drive middle overpass. (This work depends on weather and may be rescheduled.)

More information on the upcoming work is below:

LOCATION DURATION DESCRIPTION
North Mesa

 

Overnight

Nov. 26 and 27

8 pm each night to 6 am each morning

 

·      North Mesa Street (SH 20) will close in both directions between Remcon Circle and Osborne Drive.

·      All North Mesa entrance ramps and exit ramps (Exit 11) at I-10 will close.

·      South Desert Boulevard will close between McClintock Drive and North Mesa Street (SH 20).

·      McClintock Drive access to South Desert Boulevard will close.

 

LANE PATTERN CHANGE:  Crews will be re-configuring traffic lanes on the eastbound and westbound North Mesa exit ramps.

 

North Mesa

 

Overnight

Nov. 27-29

8 pm each night to 6 am each morning

 

·      One lane in each direction on North Mesa Street (SH 20) will close between Remcon Circle and Osborne Drive.

·      North Mesa exit ramp (Exit 11) from I-10 Eastbound will close.

·      South Desert Boulevard will close between McClintock Drive and North Mesa Street (SH 20).

·      McClintock Drive access to South Desert Boulevard will close.

 

Crews will be conducting pavement work.

 

Sunland Park

 

Overnight

Nov. 27-29

8 pm each night to 6 am each morning

·      Sunland Park Drive will close in both directions between Machuca Road and the mall signalized intersection.

·      The Sunland Park exit ramp (Exit 13) from I-10 Westbound will close.

·      The Sunland Park exit ramp (Exit 13) from I-10 Eastbound will be open; however, motorists will not be able to turn left onto Sunland Park Drive.

·      Paisano Drive (US 85) westbound will close at McNutt Road (NM 273). Detour: Motorists on westbound Paisano Drive (US 85) will exit at McNutt Road (NM 273).

·      The Racetrack Drive entrance ramp to westbound Paisano Drive (US 85) will close.

 

Crews will be constructing the median and a sidewalk.

 

Sunland Park

 

27 HOURS

Sunday, Dec. 2 at 3 am

until

Monday, Dec. 3 at 6 am

 

·      The exit ramps and entrance ramps at the I-10/Sunland Park interchange will close.

·      Sunland Park Drive will close in both directions between Machuca Road and the mall signalized intersection.

·      Paisano Drive (US 85) westbound will close at McNutt Road (NM 273). Detour: Motorists on westbound Paisano Drive (US 85) will exit at McNutt Road (NM 273).

·      The Racetrack Drive entrance ramp to westbound Paisano Drive (US 85) will close.

 

LANE PATTERN CHANGE:  The goal is to open more traffic lanes on the Sunland Park Drive middle overpass.

 

WEATHER NOTE:  This work activity is dependent on weather temperatures and may be re-scheduled.

 

About Staff Report

Staff Reports are just that, Staff Reporting the news. No skew, no opinion just the news. We pride ourselves on making sure that we bring you the news as soon as it is published, submitted or sent to us. No need to have a reporter rewrite or give their opinion. The facts or information, nothing more.

Check Also

Sandbag distribution returns to regular schedule Monday

The last day to pick up sandbags at the satellite distribution sites will be Sunday …

Utep Football Generic 728
Towntalk Teaser 728
Rhinos 2019/2020 728
Bordertown Undergroun Show 728
STEP 728
Rugby Coming Soon 728
Amy’s Ambassadorship
Mountains 728