window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Monday , December 10 2018
TESTIFY 728X90
RHINOS 2018-2019 728
FootballShowcase728
MEDIA FEST 728
JustLikeThat728
SUNLANDPARK 728X90
Bordertown Undergroun Show 728
Home | Tag Archives: el paso freeway closed

Tag Archives: el paso freeway closed

TxDoT/Go10 Closures, Detours and Work Schedule for Week of August 12

Here’s a look at the project closures for the week ahead, complete lists via hyperlinks, as well as the link to the utility bridge repairs.

Don’t forget to follow either Go10 or El Paso’s TxDoT on Twitter. Plus sign up for traffic alerts on www.drivetexas.org.

Cesar Chavez Maintenance Overlay Project

Monday, August 13 through Friday, August 31
9 a.m. to 4 p.m.

  • Cesar Chavez Border Highway (Loop 375) alternating eastbound and westbound closures between Fonseca entrance ramp and US-54 Paisano Drive exit ramp
  • Crews will be pouring hot mix and overlay

 

Concrete Repair Project

Thursday, Aug. 9 into Friday, Aug. 10
9 p.m. to 5 a.m. (one night only)

  • I-10 eastbound at Paisano – one left lane closed
  • I-10 westbound at Paisano – three left lanes closed
  • I-10 westbound Trowbridge entrance ramp will be closed
  • Crews will be repairing concrete barriers in the area

Sunday, Aug. 12 through Thursday, Aug. 16
9 p.m. to 5 a.m. (nightly)

  • I-10 eastbound at Paisano – three left lanes closed
  • I-10 eastbound at Raynolds entrance ramp will be closed
  • Crews will be repairing concrete barriers in the area

 

US 85 (Paisano)

Friday, Aug. 24 to Monday, Aug. 27
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work.

Monday, Aug. 20 to Wednesday, Aug. 22
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work.

 

McNutt

Friday, Aug. 10 to Sunday, Aug. 12
9 p.m. to 6 p.m. (continuous full closure)

  • Westbound and eastbound from Doniphan to Brickland Street
  • Closure is needed for painting work.

 

Friday, Aug. 17 to Sunday, Aug. 19
9 p.m. to 9 p.m. (continuous full closure)

  • Westbound and eastbound from Doniphan to Brickland Street
  • Closure is needed for traffic switch.

 

Loop 375 Border Highway

Monday, Aug. 6 to Friday Aug. 31
9 a.m. to 4 p.m. (nightly closure)

  • Eastbound and westbound from US 54 to Oregon Street
  • Closure is needed for roadway work.

 

Friday, Aug. 10 to Monday Aug. 13
9 p.m. to 5 a.m. (continuous full closure)

  • Eastbound and westbound from US 54 to Oregon Street
  • Closure is needed for roadway work.

Full Closure Lists:

West Area Project Closures  |  East Area Project Closures  |  Border West Expressway Closures  |  GO10 Closures

LOCATION DURATION DESCRIPTION
North Mesa Street

 

Overnight

Sunday, August 12

8 pm to 6 am

 

·      The North Mesa Street exit ramp from I-10 Westbound will close.

 

Detour:  Motorists should use an alternate exit ramp such as Resler Drive (Exit 12).

 

North Mesa Street

 

Continuous

Monday, August 13 at 9 am through Friday, August 17 at 3 pm

 

·      The right lane on North Mesa Street (SH 20) – in the direction traveling toward Doniphan Drive – will close between Remcon Circle and Osborne Drive.

 

Bus Service:  The Sun Metro bus stop on North Mesa Street (SH 20) at Osborne Drive (near Taco Cabana) will be closed during this work activity. An alternate bus stop is available on North Mesa Street (SH 20) at Crossroads Drive (near Pizza Hut). For more information, contact Sun Metro at (915) 212-3436 or (915) 212-3300.

 

North Mesa Street

 

Overnight

Monday, August 13 through Thursday, August 16

 

8 pm to 6 am nightly

 

·      North Mesa Street (SH 20) will close completely in both directions between Osborne Drive and Remcon Circle.

·      The North Mesa Street exit ramps – from both I-10 Eastbound and I-10 Westbound – will close.

 

Tip:  Motorists should use an alternate route or follow the marked detour.

 

Detour:  Motorists on North Mesa Street (SH 20) who want to cross from one side of I-10 to the other side should use an alternate route such as Thorn Avenue or Redd Road. The Sunland Park Drive overpass will not be an alternate route option as it will also close during these nights.

 

Crews will be installing new pavement on North Mesa Street (SH 20).

 

I-10 West at Sunland

 

Overnight

Monday, August 13 through Thursday, August 16

 

9 pm to 6 am nightly

 

·      I-10 Westbound will close at Sunland Park (Exit 13).

·      Sunland Park Drive will close in both directions at the I-10 overpass.

·      The Sunland Park Drive entrance ramp to I-10 Westbound will close.

 

Tip:  Motorists should use an alternate route or follow the marked detour.

 

Detour: Motorists will exit at Sunland Park Drive (Exit 13), then follow it to North Mesa Street (SH 20). Motorists should follow the detour signs to re-enter I-10 Westbound at the North Mesa Street (SH 20) entrance ramp.

 

I-10 East at Redd

 

27-HOURS

Sunday, August 26 at 3 am until Monday, August 27 at 6 am

 

·      I-10 Eastbound will close at Redd Road (Exit 9).

·      The Redd Road entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists on I-10 Eastbound will exit at Redd Road (Exit 9), follow it to South Desert Boulevard, then follow South Desert Boulevard to North Mesa Street (SH 20). Motorists may re-enter I-10 Eastbound using the North Mesa Street entrance ramp.

 

ATTENTION:  By the morning of August 27, traffic on I-10 Eastbound at North Mesa Street (SH 20) will experience a change in lane patterns. Please proceed cautiously.

  

RHINOS 2018-2019 728
TESTIFY 728X90
FootballShowcase728
SUNLANDPARK 728X90
JustLikeThat728
Bordertown Undergroun Show 728
MEDIA FEST 728