window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Friday , August 14 2020
Mountains 728
EMERGENCE MINDFUL 728.90
Utep Football Generic 728
PBP_728
Covid-19 Fund 728
Elizabeth 728
ENTERPRISE 728
Spring Training 728
TRLA_728
john overall 728×90
Emergence June 11 – Sep 11, 2020 728
Home | Tag Archives: el paso road detours

Tag Archives: el paso road detours

Connect10, TxDoT closures, detours for Week of Aug 2nd.

Another busy week for crews around the area, as some high impact closures, including an upcoming traffic switch, are highlighted below for the week ahead.

For the Connect10 project, simultaneous eastbound, westbound closures on  I-10 at US 54 scheduled for Sunday, Monday nights.

Closure Links: West Area Project Closures  |  I-10 Connect Project Closures  |  East Area Project Closures

Mesa Park Interchange Project

Sunday, August 2 through Saturday, August 8
Nightly, 9 p.m. to 6 a.m.

  • I-10 eastbound between Sunland Park and Schuster complete closure.
  • Crews will be removing overhang from underpass bridge and Tri-State will be installing signs.

Monday, August 10 through Saturday, August 15
Nightly, 9 p.m. to 6 a.m.

  • I-10 westbound between Executive and Executive westbound on ramp complete closure.
  • Crews will be removing overhang and painting.

Guardrail Repair

Wednesday, August 5
9 a.m. to 4 p.m.

  • SH-178 (Artcraft) eastbound between Upper Valley and Doniphan right lane closed.
  • SH-178 eastbound between Doniphan and Berringer with complete Doniphan on-ramp closure.

Friday, August 7
9 a.m. to 4 p.m.

  • North Desert between Northern Pass and Trade Center left lane closed.
  • IH-10 westbound between Nashua and Vinton right lane closed with complete Vinton off-ramp closure.

Pothole Repair

Monday, August 3 through Friday, August 7
9 a.m. to 4 p.m.

  • SH-20 (Mesa) westbound between Sunland Park and Resler middle-right lane closed.

Spall Repair

Sunday, August 2 through Thursday, August 6
Nightly, 9 p.m. to 5 a.m.

  • I-10 eastbound between Porfirio Diaz exit and Cotton on-ramp alternating lane closures.

Maintenance

Friday, July 31 through Friday, August 7
8 a.m. to 3 p.m.

  • SH-20 (Doniphan) east and westbound between Spur 6 and Spur 37 (Vinton Rd) right lane closed.
  • Crews will be doing shoulder work.
  • Woodrow Bean east and westbound between US-54 and Railroad alternate lane closures.
  • Crews will be cleaning.

Thursday, August 6
8 a.m. to 3 p.m.

  • US-54 south and northbound between Railroad and Mesquite Hills complete road closure.
  • Union Pacific will be working on the railroad.

Loop 375 Frontage Road Project

Monday, Aug. 3 through Friday, Aug. 7 (complete closure)
Daily, from 6 a.m. until 4 p.m.

  • South Americas Avenue (frontage road) northbound to southbound turnaround complete closure at North Loop Drive
  • South Americas Avenue southbound traffic detour at North Loop Drive

Crews will be hauling material for retaining walls.

Monday, Aug. 3 through Friday, Aug. 7
Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 southbound right lane closure from North Loop Drive to Alameda Avenue
  • South Americas Avenue (frontage road) traffic detour at temporary North Loop entrance ramp

Crews will be installing bridge forms.

Wednesday, Aug. 5 through Friday, Aug. 7
Nightly, from 9 p.m. until 5 a.m. (overnight)

  • South Americas Avenue (frontage road) southbound left lane closure from Socorro Road to Pan American

Crews will be pouring stamped concrete riprap.

Zaragoza/Montwood Improvement Project

Monday, Aug. 3
Daily, from 7 a.m. until 4 p.m. and continuous until further notice

  • Joe Battle Boulevard southbound left lane closure from Lyman Dutton Circle to Zaragoza Road intersection
  • Joe Battle Boulevard northbound left lane closure from Montwood Drive to Zaragoza Road intersection

Crews will be constructing new retaining wall.

Monday, Aug. 3 through Monday, Aug. 10
Daily, from 7 a.m. until 4 p.m. and continuous until further notice

  • Zaragoza Road northbound complete lane closure between Walmart/Chick-Fil-A driveway and McDonalds (all businesses will have one driveway open)
  • Traveling public will be shifted to the southbound lanes of roadway

Crews will be preparing roadway for pavement panels.

Monday, August 10 – TRAFFIC SWITCH

Daily, continuous until further notice

  • Montwood Drive eastbound complete lane closure between Joe Battle Boulevard and Firehouse Drive
  • Traveling public will be shifted to westbound lanes of roadway
  • New section of Zaragoza will be open at Joe Battle Boulevard southbound to Montwood Drive to relieve traffic congestion

Crews will be reconstructing placement of concrete panels.

I-10 Connect

Sunday, Aug. 2, and Monday, Aug. 3
Nightly 9 p.m. to 5 a.m.

  • Eastbound I-10 will be closed to all traffic at Loop 478 (Copia Street).
  • DETOUR: Take Exit 22A (Copia Street), continue on Gateway Boulevard East and re-enter I-10 at Raynolds Street.
  • JUÁREZ DETOUR: Continue on Gateway East, turn right on Paisano and follow the marked US 62 detour.
  • Westbound I-10 will be closed to all traffic at US 54.
  • DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss), use the newly widened turnaround at Pershing Drive, enter southbound US 54 and follow signs to Westbound I-10 or Juárez.
  • Ramp C, which connects northbound US 54 to westbound I-10, will be closed to all traffic.
  • DETOUR: Continue on northbound US 54, use the newly widened turnaround at Pershing Drive, enter southbound US 54 and follow signs to westbound I-10 or Juárez.
  • Crews will be placing an overhead bridge deck and painting.

Tuesday, Aug. 4
9 p.m. to 9 a.m.

  • Southbound US 54 will be closed to all traffic between I-10 and US 62 (Paisano Drive).
  • DETOUR: Take Exit 21A (I-10 East/Van Horn) to Exit 23B (US 62/180/Chelsea Street/Paisano Drive), turn right on Paisano and follow the marked US 62 detour.
  • Ramp E which connects Gateway Boulevard South to southbound US 54 at Yandell Drive will be closed.
  • DETOUR: Enter southbound US 54 at Pershing Drive.
  • Crews will be working on an overhead bridge deck.

Monday, Aug. 3, through Friday, Aug. 7
Daily from 9 a.m. to 4 p.m.

  • The offramp connecting westbound I-10 to Gateway Boulevard West at Loop 478 (Copia Street) will be closed to all traffic.
  • DETOUR: Take Exit 21 (Piedras Street) to Gateway West.
  • Crews will be conducting electrical work.

***

Eastbound and westbound motorists on I-10 and motorists heading to Ciudad Juárez should expect overnight detours on Sunday and Monday as crews work on overhead bridges and paint newly placed concrete to match the rest of the Spaghetti Bowl interchange.

Sunday, August 2, and Monday, August 3

Nightly 9pm to 5am

  • Eastbound I-10 will be closed to all traffic at Loop 478 (Copia Street).
  • DETOUR: Take Exit 22A (Copia Street), continue on Gateway Boulevard East and re-enter I-10 at Raynolds Street.
  • JUÁREZ DETOUR: Continue on Gateway East, turn right on Paisano and follow the marked US 62 detour.
  • Westbound I-10 will be closed to all traffic at US 54.
  • DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss), use the newly widened turnaround at Pershind Drive, enter southbound US 54 and follow signs to Westbound I-10 or Juárez.
  • Ramp C, which connects northbound US 54 to westbound I-10, will be closed to all traffic.
  • DETOUR: Continue on northbound US 54, use the newly widened turnaround at Pershing Drive, enter southbound US 54 and follow signs to westbound I-10 or Juárez.

Crews will be placing an overhead bridge deck and painting.

Tuesday, August 4, from 9pm to 9am

  • Southbound US 54 will be closed to all traffic between I-10 and US 62 (Paisano Drive).
  • DETOUR: Take Exit 21A (I-10 East/Van Horn) to Exit 23B (US 62/180/Chelsea Street/Paisano Drive), turn right on Paisano and follow the marked US 62 detour.
  • Ramp E which connects Gateway Boulevard South to southbound US 54 at Yandell Drive will be closed.
  • DETOUR: Enter southbound US 54 at Pershing Drive.

Crews will be working on an overhead bridge deck.

Monday, August 3, through Friday, August 7

Daily from 9am to 4pm

  • The offramp connecting westbound I-10 to Gateway Boulevard West at Loop 478 (Copia Street) will be closed to all traffic.
  • DETOUR: Take Exit 21 (Piedras Street) to Gateway West.

Crews will be conducting electrical work.

***from EP Water

Traffic Alert: Lane restrictions at Doniphan Dr. and Frontera Rd.

Doniphan Drive to be partially closed for emergency stormwater construction work

Beginning Monday, August 3, Doniphan Dr. at Frontera Rd. will be partially closed as El Paso Water begins emergency repairs on a stormwater junction box, which is a below-ground structure that captures and redirects stormwater from multiple drain pipes. This work is necessary to protect the safety of drivers and pedestrians and to improve the stormwater system in the area.

“Because of high groundwater in the area, the junction box near the sidewalk has sunk and is beginning to break, creating a public safety issue,” said Chief Technical Officer Gilbert Trejo. “Every time it rains, the problem becomes worse. So, we’re going to replace the box and connect the structure with stronger materials using technology that will protect the groundwater and stabilize the soil.”

Starting on Aug. 10, the two northbound lanes of Doniphan Dr. near Frontera Rd. will close between Kappa Rd. and Atlantic Rd. The southbound lanes will convert to two-way traffic with one lane in each direction to accommodate northbound traffic. This traffic pattern will be in place for approximately six months.

The public is encouraged to plan ahead and seek alternate routes during the construction

TxDoT, Connect10 closures, detours and work for week of May 24th

Construction crews will be in action all this week, so here’s a look at the upcoming project closures for the week ahead.

Significant closures are highlighted below and complete closure lists via hyperlinks are included below.

When it’s completed, the I-10 Connect Project will change the way many of us to get to Juárez. While the project still has many months to go, some permanent changes will go into effect next week.

Beginning at 6am on Wednesday, May 27, crews will begin demolishing parts of the I-110/US 62 (Paisano Drive) interchange immediately north of the Bridge of the Americas. No left turns and no thru traffic will be permitted at any of the traffic lights on the mid-level of the interchange. Eventually, right turns will be eliminated or reconfigured, too. Stevens Street between the Franklin Canal and Interstate 110 will close permanently at this time as well.

During the week of May 27, crews will implement pedestrian detours, too. Pedestrians will be able to travel north and south as usual via the mid-level of the interchange. However, they will not be able to travel east and west at that location. To accommodate east-west pedestrian traffic, augmented safety measures included pedestrian fencing, speed bumps to slow motorists and a temporary crosswalk immediately north of the Bridge of the Americas will be put in place.

All traffic leaving the Bridge of the Americas will be temporarily required to turn right on US 62 (Paisano Drive) during the demolition work. Traffic on eastbound and westbound US 62 and southbound I-110 will not be impacted at this time.

When the project is completed, all motorized traffic will access the Bridge of the Americas via Interstate 110 — the short freeway spur connecting US 54 to the bridge. T his will alleviate congestion on Paisano near the Chamizal National Memorial and the El Paso Zoo.

Motorists are encouraged to begin adjusting to that eventual configuration now by following the marked “Juárez, México” detours which take traffic via the Pershing Drive Turnaround to US 54 to I-110.

Other nightly closures will be in place in the coming weeks to accommodate demolition at this interchange.

Links to complete list of closures:  West Area Projects  |  I-10 Connect  |  East Area Projects

Mesa Park Interchange Project

Sunday, May 31, 4 a.m. to Monday, June 1, 5 a.m.

  • I-10 westbound lanes at Underpass Span #2 from Executive to Sunland Park full closure.
  • Crews will be setting girders.

Monday, June 1 to Saturday, June 6

Nightly, 9 p.m. to 6 a.m.

  • I-10 westbound lanes at Executive full closure.
  • Crews will be setting girders.

Saturday, June 6, 6 a.m. to 6 p.m.

  • I-10 westbound at Executive off-ramp full closure.
  • Crews will be setting girders.

Sunday, June 7, 4 a.m. to Monday, June 8, 6 a.m.

  • I-10 eastbound at Sunland Park complete closure.
  • I-10 eastbound lanes at Underpass Span #3 from Executive to Sunland Park full closure.
  • Crews will be setting girders.

Monday, June 8 to Saturday, June 13

Nightly, 9 p.m. to 6 a.m.

  • I-10 westbound at Executive complete closure.
  • Crews will be performing miscellaneous repair work.

Mesa (SH-20) Safety Improvement Project

Monday, May 25 through Friday, May 29

8 a.m. to 4 p.m.

  • Mesa between Festival and Crown Point alternate lane closures.
  • Mesa between Cincinnati and Gregory alternate lane closures.
  • Mesa between Castellano and Montecillo alternate lane closures.
  • Follow all detours until further notice.
  • Crews will be working on traffic signal improvements.

Maintenance Project

Monday, May 25 through Friday, May 29

8 a.m. to 3 p.m.

  • Loop 375 Border Highway eastbound/westbound at Fonseca, Midway, Yarbrough, and Padres, exit and entrance ramps closed.
  • Crews will be cleaning and milling.
  • I-10 westbound at downtown Mesa exit right lane closed
  • Crews will be cleaning homeless debris.
  • Woodrow Bean between Kenworthy and Railroad alternate lane closures.
  • Crews will be cleaning and pruning.

Mesa Rehabilitation Project

Tuesday, May 26 through Friday, May 29

Until further notice

  • Mesa northbound from Baltimore to Brentwood alternate lane closures.
  • Crews are removing and replacing pavement and mitigating clay deposits.

Border West Expressway

Tuesday, May 26

9 a.m.-4 p.m.

  • Full closure of Exit Ramp 66 (Paisano) eastbound.
  • Crews will be conducting concrete repair.

Wednesday, May 27

9 a.m.- Noon

  • Rolling closure of Exit Ramp 66 (Paisano) eastbound.
  • Crews will be working on pavement markings.

 

I-10 Connect

Wednesday, May 27, and Thursday, May 28

Nightly from 9pm to 5am

  • Northbound US 54 will be closed to all traffic between Loop 375 and I-10.
  • DETOUR: From westbound Loop 375, take Exit 20 (US 62/Paisano Drive), continue on Gateway Boulevard North, follow signs to eastbound I-10, turnaround at Trowbridge Drive, from westbound I-10 take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss).

Crews will begin demolishing parts of the I-110/US 62 interchange.

Sunday, May 31, and Thursday, June 4

Nightly from 9pm to 5am

  • Southbound US 54 will be closed to all traffic between I-10 and Loop 375.
  • DETOUR: Take Exit 21A (I-10 East/Van Horn), from eastbound I-10 take Exit 23B (US 62/180/Chelsea Street/Paisano Drive), turn right on Paisano, to SH 20 (Alameda Avenue), to Loop 478 (Copia Street).

Crews will begin demolishing parts of the I-110/US 62 interchange.

Wednesday, May 27, through Saturday, May 30

Daily from 9am to 4pm

  • The on-ramp from Gateway Boulevard South to southbound US 54 north of Pershing Drive will be closed to all traffic.
  • DETOUR: Enter southbound US 54 south of Pershing Drive.
  • Lane closures will be in place in the southbound US 54 Collector-Distributor Lanes between Pershing Drive and Montana Avenue.

Crews will be working on a new dynamic message sign.

Wednesday, May 27, through Saturday, May 30

Daily from 9am to 4pm

  • Alternating, intermittent closures will be in place on US 62/180 (Paisano Drive) at I-10.

Crews will be conducting electrical work.

Friday, May 29, from 9am to 4pm

  • Ramp E which connects Gateway Boulevard South to southbound US 54 at Yandell Drive will be closed to all traffic.
  • DETOUR: Enter southbound US 54 south of Pershing Drive

Crews will be conducting electrical work.

The following long-term closures will continue without interruption:

  • Ramps F and G, which connect I-10 to Juárez at the Spaghetti Bowl, remain detoured through northbound US 54 to Pershing Drive until further notice.
  • Interstate 110, the short freeway spur leading to and from the Bridge of the Americas, remains closed to northbound traffic until further notice.
  • The ramp from southbound US 54 to US 62 (Paisano Drive) remains closed until further notice.
  • Both turnarounds under US 54 at US 62 (Paisano Drive) remain closed until further notice.
  • Intermittent closures on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Intermittent closures will be in place on Gateway Boulevard West between Boone Street and Palm Street.
  • Intermittent closures will be in place on Durazno Avenue, Rosa Avenue and Uva Street.
  • Intermittent lane closures will be in place on US 54 between Loop 375 and Spur 601.
  • Intermittent lane closures will be in place on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Lane closures will be in place on eastbound and westbound SH 20 (Alameda Avenue) at US 54 until further notice.
  • Lane closures will be in place on eastbound and westbound US 62 (Paisano Drive) between I-110 and US 54 until further notice.
  • Lane closures will be in place on Ramp D, which connects southbound US 54 to eastbound I-10 until further notice.
  • Lane closures will be in place on Ramp H, which connects eastbound I-10 to northbound US 54, until further notice.

Onramp and offramp closures may begin up to one hour earlier than stated times. All information is subject to change based upon weather and field conditions.

Loop 375 Frontage Road Project

Tuesday, May 26

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice

  • Loop 375 southbound complete closure from North Loop Drive to Zaragoza Road
  • Loop 375 southbound permanent closure at Zaragoza Road exit ramp
  • Loop 375 southbound temporary Pan American exit ramp open
  • Traveling public will exit at North Loop Drive and detour to Zaragoza Road
  • Closure is necessary for construction of new Pan American Drive exit ramp

Crews will be drilling, pouring and installing a Horizontal Lifeline System in preparation to install landscape rock

Wednesday, May 27

Daily, from 9 a.m. until 12 p.m. and continuous until further notice

  • Loop 375 northbound complete closure at Socorro/Alameda exit ramp
  • Americas Avenue northbound left lane closure between Socorro/Alameda exit and Socorro Road to include turnaround along frontage road
  • Closure is necessary for reconstruction of new Pan American Drive exit ramp

Crews will be moving and resetting portable concrete traffic barrier

Wednesday, May 27

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice

  • Loop 375 southbound complete closures from Pan American to Zaragoza Road exit ramp
  • Loop 375 southbound permanent closure at Zaragoza Road exit ramp
  • Loop 375 southbound temporary Pan American exit ramp open
  • Closure is necessary for construction of new Pan American Drive exit ramp

Crews will be painting concrete barrier and installing landscape rock

Thursday, May 28

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice

  • Loop 375 southbound complete closure at Pan American exit ramp
  • Americas Avenue southbound left lane closure between Pan American exit and Socorro Road to include turnaround along southbound frontage road
  • Closure is necessary for construction of new Pan American Drive exit ramp

Crews will be installing landscape rock

Monday, May 25 and continuous until further notice

Daily, from 9 a.m. until 4 p.m. and continuous until further notice

  • Americas Avenue southbound alternating lane closures between North Loop Drive and Zaragoza Road
  • Americas Avenue northbound alternating lane closures between Americas Avenue and Socorro Road
  • Americas Avenue northbound to southbound turnaround at Alameda Avenue closed
  • Loop 375 southbound complete closure at Socorro Road entrance ramp (no longer in use)
  • Closure is necessary for construction of new Pan American Drive exit ramp
  • Loop 375 northbound complete closure at Zaragoza Road entrance ramp between South Americas to Pan American (no longer in use)

Closure is necessary for construction of new Pan American Drive exit ramp

Connect10, TxDoT closures, detours for week of Febrary 16

Here’s a look  project closures for the week ahead, including work scheduled to start Friday night.

Friday night and into next week, Paisano between US-54 and I-110 is closed to traffic overnight, with a marked detour that’s easy to follow. I-10 Connect has been closing on and off ramps intermittently, so look out for those. Both the Copia on ramp (daytime) and the Chelsea off ramp (overnight) are going to have closures.

Next week, every night, I-10 west will be closed from Hawkins to Airway, starting at 9PM.

The weather has caused some rescheduling of closures because we cannot do concrete work with low temps and precipitation. The weather also means crews are out repairing potholes and guardrail, so be aware of those mobile crews.

Follow TxDoT El Paso on twitter @txdotelp for the latest information or sign up for email updates at www.drivetexas.org

Highlighted below are some additional  closures and complete closure lists via hyperlinks.

Links to full lists of closures:  West Area Projects   |   I-10 Connect   |   East Area Projects

I-10 CONNECT PROJECT

UPDATE

Wednesday, February 12; Thursday, February 13; Tuesday, February 18; and Wednesday, February 19
Nightly from 9pm to 5am

  • Eastbound US 62 (Paisano Drive) will be closed to all traffic between I-110 and US 54.
  • DETOUR: Turn right on San Marcial Street, left on Delta Drive and left on Boone Street.

Crews will be installing concrete pavement.

Monday, February 17, through Thursday, February 20

Nightly from 9pm to 5am

  • Southbound US 54 will be closed between I-10 and Loop 375.

DETOUR: Take Exit 21A (I-10 East/Van Horn), take Exit 23B (US 62/180/Chelsea Street/Paisano Drive), travel south on Paisano to US 54.

  • SH 20 (Alameda Avenue) will be closed to all traffic at US 54.

DETOURS: Eastbound traffic will turn left on Loop 478 (Copia Street), right on Gateway Boulevard East, and right on Raynolds street. Westbound traffic will use westbound US 62 (Paisano Drive) and turn right on Loop 478 (Copia Street).

NOTE: Alameda will remain open to local traffic only except for the area immediately under US 54.

Crews will be working on a concrete bridge deck.

Monday, February 17, and Tuesday, February 18

Daily from 9pm to 5am

  • The offramp from eastbound I-10 to US 62/180/Chelsea Street/Paisano Drive will be closed to all traffic.

DETOUR: Take Exit 25 (Airway Boulevard/El Paso Airport) and use the turnaround.

Crews will be performing electrical work.

Until Further Notice

Daily from 9am to 4pm

  • The onramp which connects Gateway Boulevard East to eastbound I-10 at Loop 478 (Copia Street) will be closed to all traffic.

DETOUR: Enter eastbound I-10 at Raynolds Street.

Crews will be demolishing parts of an overhead ramp.

MALL BRAIDED RAMPS PROJECT

Sunday, Feb. 16 through Thursday, Feb. 21 (complete closure)

9 p.m. to 5 a.m. (overnight)

  • I-10 westbound complete closure between Hawkins Boulevard and Airway Boulevard

Crews will be repairing armored joint

Monday, Feb. 17 through Friday, Feb. 21

7 a.m. to 4 p.m.

  • Gateway Boulevard eastbound left lane closure at Hawkins Boulevard intersection

Crews will be working on retaining walls

Monday, February 17 through Friday, February 21

9am to 4pm

  • IH10 at Airway turnaround closed in both directions.
  • IH10 Eastbound from Hunter/Viscount right lane and shoulder closure.
  • IH10 Westbound at Airway off-ramp closure.
  • IH10 Westbound at Hawkins on-ramp closure.
  • IH10 Westbound from Hawkins to Airway right shoulder closure.

Wednesday, February 19

9pm to 5am

  • Gateway Blvd West from Westmoreland to Airway intersection closure.

Thursday, February 20

9pm to 5am

  • Gateway Blvd East and West intersection at Airway closure.

US54 Widening and Illumination Project

Monday, February 17 through Friday, February 21

9am to 4pm

  • Alternate lane closures.

Follow all detours until further notice.

GO10 Project Utility

Monday, February 17 through Friday, March 6

Continuous

  • Mesa Eastbound (in the direction headed toward the mountain) will be reduced to one lane between Osborn and Remcon. Blergh.
  • No right turns will be permitted onto Mesa from Westbound CD/IH10 Mesa exit ramp.

Guardrail Repair Project

Tuesday, February 18

9am to 4pm

  • IH10 Westbound from Artcraft to Transmountain overpass left lane closure.

Wednesday, February 19

9am to 4pm

  • Spur 601 Westbound from Global Reach to Spur right lane closure.

Thursday, February 20

9am to 4pm

  • LP375 Eastbound from Plant to Zaragoza right lane closure.

Friday, February 21

9am to 4pm

    • I-10 eastbound from Schuster to Porfirio Diaz with complete off-ramp closure at Porfirio Diaz.

Pothole Repairs

Tuesday, February 18 through Friday, February 21

9am to 4pm

  • Mesa between Brentwood and Executive, Northbound and Southbound alternating lane closures.

Loop 375 Frontage Road Project

Sunday, Feb. 16 through Tuesday, Feb. 18

9 p.m. to 5 a.m. (overnight)

  • Loop 375 southbound right lane closure between North Loop Drive to Alameda Avenue
  • Americas Avenue southbound closure at North Loop Drive entrance ramp
  • Loop 375 traffic detour westbound at North Loop Drive to Zaragoza Road
  • Loop 375 traffic detour eastbound at North Loop Drive to Inglewood Drive

Crews will be installing portable concrete traffic barrier on entrance ramp and work zone striping

Until further notice

9 a.m. to 4 p.m.

  • Americas Avenue southbound alternating lane closures between North Loop Drive and Zaragoza Road
  • Americas Avenue northbound alternating lane closures between Americas Avenue and Socorro Road
  • Americas Avenue northbound to southbound turnaround at Alameda closed
  • Loop 375 southbound complete closure at Socorro Road entrance ramp (no longer in use)

Closure is necessary for construction of new Pan American Drive exit ramp

Zaragoza/Montwood Improvement Project

Until further notice (complete closure)

  • Montwood Drive westbound from Joe Battle Southbound to Zaragoza intersection shoulder (Bike Lane)

Crews will be installing drainage system

Until further notice

  • Joe Battle and Zaragoza intersection southbound to northbound turnaround closure

Closure is necessary for construction of new retaining wall

TxDoT, Connect10 closures, detours for week of January 26

Here’s a look at project closures for the week ahead including an I-10 closure and a significant closure on Loop 375.

Highlighted below are some high impact closures and complete closure lists via hyperlinks are also included.

Links to full lists of closures:

West Area Projects    |    I-10 Connect    |    East Area Projects

Pothole Repairs

Monday, Jan. 27 through Friday, Jan. 31

  • Mesa between Brentwood and Executive, Northbound and Southbound, alternating lane closures.

IH-10 Ramp Improvements – Phase 2

Monday, Jan. 27 through Friday, Jan. 31

9am to 4pm

  • Gateway Blvd East, Hawkins to Winslow right two lanes closed.
  • Airway turnaround closed in both directions.
  • Airway underpass Northbound and Southbound right lane closed.
  • Hunter/Viscount off-ramp closed.
  • Gateway Blvd West from Viscount to Hawkins right two lanes closed.
  • Gateway Blvd East from Tony Lama to Hunter full lane closure.

Monday, Jan. 27 through Friday, Jan. 31

9pm to 5am (Night)

  • IH-10 Eastbound from Viscount/Hunter to McRae Blvd closed.
  • Traffic will exit at Hunter/Viscount and re-enter at McRae Blvd..

Mall Braided Ramps Project

Sunday, Jan. 26 through Friday, Jan. 31

9 p.m. to 5 a.m.

  • Gateway Boulevard eastbound left lane closure between Hawkins Boulevard and Airway Boulevard
  • Crews will be working on median barrier

Monday, Jan. 27 through Friday, Jan. 31

7 a.m. to 4 p.m.

  • Gateway Boulevard eastbound left lane closure at Hawkins Boulevard intersection
  • Crews will be working on retaining walls

Loop 375 Frontage Road Project

Sunday, Jan. 26 (complete closure)

7 p.m. to 5 a.m. (overnight)

  • Loop 375 southbound complete closure between North Loop Drive to Alameda Avenue
  • Loop 375 southbound entrance ramp at North Loop Drive closed
  • Loop 375 southbound turnaround at North Loop Drive closed (frontage road)
  • Loop 375 southbound traffic will exit at Americas Avenue (Exit 45A) exit ramp
  • I-10 Direct Connector to Loop 375 southbound traffic will exit at North Loop Drive (Exit 45)
  • Loop 375 traffic detour westbound at North Loop Drive to Zaragoza Road then south on Zaragoza Road to Loop 375
  • Loop 375 traffic detour eastbound at North Loop Drive to Inglewood Drive then south to Alameda Avenue and west to Loop 375
  • Crews will be installing work zone striping

Monday, Jan. 27 (complete closure)

9 p.m. to 5 a.m. (overnight)

  • Loop 375 southbound complete closure at North Loop Drive intersection and overpass
  • Loop 375 southbound traffic will exit at Americas Avenue (Exit 45A) exit ramp
  • I-10 Direct Connector to Loop 375 southbound traffic will exit at North Loop Drive (Exit 45)
  • Crews will be installing portable concrete traffic barrier and work zone striping

Tuesday, Jan. 28 through Wednesday, Jan. 29

9 p.m. to 5 a.m. (overnight)

  • Loop 375 southbound right lane closure between North Loop Drive to Alameda Avenue
  • Americas Avenue southbound closure at North Loop Drive entrance ramp
  • Loop 375 traffic detour westbound at North Loop Drive to Zaragoza Road
  • Loop 375 traffic detour eastbound at North Loop Drive to Inglewood Drive
  • Crews will be installing portable concrete traffic barrier on entrance ramp and work zone striping

I-10 Landscape Improvements

Through Friday, March 20, 2020

9 a.m. to 3 p.m.

  • I-10 alternating eastbound and westbound left and right lane closures between Eastlake Boulevard and Horizon Boulevard
  • I-10 alternating eastbound and westbound entrance and exit ramps to include turnaround
  • Closure is necessary for construction of landscape improvements to include excavation, ground cover, modular block planters, concrete and maintenance

Guardrail Repair Project

Monday, Jan. 27

9am to 4pm

  • US54 Southbound from Hondo Pass to Ellerthorpe right lane closure with complete Hercules off-ramp closure.

Tuesday, Jan. 28

9am to 4pm

  • IH10 Westbound from McRae to Hawkins right lane closure with complete McRae on-ramp closure.

Maintenance

Monday, Jan. 27 through Friday, Jan. 31

8am to 3pm

  • US54 Southbound by Cassidy Gate right shoulder closed.
  • Robert E. Lee under IH10 between Gateway Blvd East and Gateway Blvd West complete closure.
  • IH-10 Westbound between Airways and Geronimo right lane closed.
  • Airways entrance ramp to IH10 Westbound closed.

TxDoT/Connect10/Go10 project detours, construction & closures for week of April 1

There is a 27-hour closure this weekend as crews on our GO10 Project work on the final configuration for the North Mesa intersection.

PLAN AHEAD:

  • As part of our Montana Avenue Widening Project, El Paso Electric (EPE) will be placing new cables on structures along Montana Avenue, requiring a complete closure between Lee Trevino and George Dieter this Sunday, March 31, from 6 a.m. to 11 a.m. More details below.
  • The first I-10 Connect monthly community meetings at which members of the public can get updates on project progress and upcoming traffic impacts is scheduled 5:30 – 7pm on Tuesday, April 2, 2019, in the Medical Education Building at Texas Tech University Health Science Center El Paso’s Paul L. Foster School of Medicine, corner of Rick Francis Street and Robert Brown Avenue. Our bilingual hotline is also up and running!
  • Mesa Park Interchange Project 28-hour closure scheduled for Sunday, April 7,  2 a.m. to Monday, April 8, 6 a.m. Complete closure of I-10 eastbound. Traffic will exit at Sunland Park. On-ramp at Executive eastbound will be closed.

This week, GO 10 reached two major completion milestones:

  • All the main lanes of the Sunland Park Drive overpass are now open.
  • The Resler westbound exit ramp is also now open.

US 54 Widening and Illumination Project

Saturday, April 6
5 a.m. to 5 p.m.

  • Full freeway closure main lanes US 54 north and southbound
  • Traffic northbound will exit Hondo Pass and reenter Transmountain
  • Traffic southbound will exit Transmountain and reenter at Hondo Pass

 

GO10

North Mesa

27-hour Closure
Sunday, March 31 at 3 a.m., to Monday, April 1 at 6 a.m.

  • All the exit ramps and entrance ramps at I-10 and North Mesa will close.
  • North Mesa Street (SH 20) will close in both directions between Osborne Drive and Remcon Circle.
  • South Desert Boulevard is closed at McClintock Drive.
  • Completion Milestone: Once this closure lifts, permanent traffic signals and permanent lane striping will be in place along North Mesa Street (SH 20), and barriers along North Mesa Street (SH 20) will be removed.
  • Note: The North Mesa entrance ramp to I-10 westbound will remain closed.

I-10 West

Sunday, March 31
9 p.m. to 6 a.m. the following morning

  • I-10 westbound will close completely between the Sunland Park exit ramp and the Sunland Park entrance ramp.
  • Detour: Motorists on I-10 westbound will exit at Sunland Park (Exit 13) and immediately re-enter I-10 westbound at the next entrance ramp.
  • Crews will be pouring concrete in the median of I-10 between Sunland Park and Executive Center.

27-hour Closure
Sunday, April 7 at 3 a.m., to Monday, April 8 at 6 a.m.

  • I-10 westbound will close completely at North Mesa Street (SH 20).
  • North Desert Boulevard will close between North Mesa and Thorn.
  • Completion Milestone: Once this closure lifts, the new North Mesa entrance ramp to I-10 westbound will be open.

Sunland Park

Monday, April 1
9 p.m. to 6 a.m. the following morning

  • The Sunland Park Drive flyover entrance ramp to I-10 eastbound and to US 85 eastbound will close.
  • Crews will be installing new overhead exit signs.

I-10 East

Thursday, April 4
9 p.m. to 6 a.m. the following morning

  • I-10 eastbound will close between the North Mesa exit ramp (Exit 11) and Executive Center Boulevard. Detour: Motorists on I-10 eastbound will exit at North Mesa (Exit 11) and follow North Mesa Street (SH 20) to Executive Center Boulevard. Motorists may use the Executive Center entrance ramp to re-enter I-10 eastbound.
  • All entrance ramps to I-10 eastbound will close between the North Mesa Street overpass and the Executive Center Boulevard overpass.
  • Paisano Drive (US 85) – in front of the auto dealerships – will close at Sunland Park Drive.
  • Crockett Street access to Paisano Drive (US 85) will close.
  • The Sunland Park Drive flyover entrance ramp to I-10 eastbound and to US 85 eastbound will close.
  • The Resler Drive flyover entrance ramp to I-10 eastbound will close.
  • Crews will be installing overhead exit signs along I-10 and conducting other work in the I-10 median.

 

Loop 375 Frontage Road Project

Monday, April 1 – Thursday, April 4 (complete closures)
9 p.m. to 5 a.m. (overnight)

  • Loop 375 northbound complete closure at Socorro Road/Alameda Avenue exit ramp
  • All traffic will exit at Zaragoza Road exit ramp or North Loop Road exit ramp
  • Crews will be installing portable concrete traffic barrier and temporary striping

12 a.m. to 5 a.m.

  • Loop 375 northbound complete main lane closure between Zaragoza Road and Socorro Road
  • All traffic will exit at Zaragoza Road exit ramp (frontage road) and re-enter at Alameda Avenue entrance ramp
  • Crews will be installing portable concrete traffic barrier and temporary striping

Tuesday, April 2 (complete closure)
9 p.m. to 12 a.m. (overnight)

  • Loop 375 northbound complete closure at South Americas entrance ramp
  • All frontage road traffic will enter Loop 375 at Alameda Avenue entrance ramp
  • Crews will be installing portable concrete traffic barrier and temporary striping

12 a.m. to 5 a.m.

  • Loop 375 northbound complete main lane closure between Zaragoza Road and Socorro Road
  • All traffic will exit at Zaragoza Road exit ramp (frontage road) and re-enter at South Americas Avenue entrance ramp
  • Crews will be installing portable concrete traffic barrier and temporary striping

 

Border West Expressway

Doniphan

Saturday, March 30 to Sunday, March 31
5 a.m. to 6 p.m. (continuous full closure)

  • Eastbound and westbound from Racetrack to Executive
  • Closure is needed for structure work.

 

Hawkins/Viscount Operation Improvements Project

Monday, April 1, through Thursday, April 4
9 p.m. to 6 a.m. (nightly closure)

  • Complete closure on Gateway east between Hawkins to Tony Lama
  • Crews will be working on electrical work in the area

 

Pothole Repair Project

Monday, April 1
9 p.m. to 6 a.m. (throughout the night)

  • Right shoulder closure on I-10 west at the Copia on-ramp
  • Copia westbound on-ramp will be closed

 

Guardrail Repair Project

Thursday, April 4
9 a.m. to 4 p.m. (throughout the day)

  • Right lane closure on I-10 eastbound between Copia and Raynolds
  • Raynolds exit will be closed

 

Links to full lists of closures:

West Area Projects | GO10Border West Expressway

I-10 Connect  | East Area Projects | El Paso Electric Montana Closure (This weekend!)

LOCATION DURATION DESCRIPTION
North Mesa

 

27 HOURS

Sunday, March 31 at 3 am to Monday, April 1 at 6 am

 

·      All the exit ramps and entrance ramps at I-10 and North Mesa will close.

·      North Mesa Street (SH 20) will close in both directions between Osborne Drive and Remcon Circle.

·      South Desert Boulevard is closed at McClintock Drive.

 

Completion Milestone:  Once this closure lifts, permanent traffic signals and permanent lane striping will be in place along North Mesa Street (SH 20); and barriers along North Mesa Street (SH 20) will be removed.

 

Note: The North Mesa entrance ramp to I-10 Westbound will remain closed.

 

I-10 West Overnight

Sunday, March 31

9 pm to 6 am the following morning

 

·      I-10 Westbound will close completely between the Sunland Park exit ramp and the Sunland Park entrance ramp. Detour: Motorists on I-10 Westbound will exit at Sunland Park (Exit 13) and immediately re-enter I-10 Westbound at the next entrance ramp.

 

Crews will be pouring concrete in the median of I-10 between Sunland Park and Executive Center.

 

Sunland Park

 

Overnight

Monday, April 1

9 pm to 6 am the following morning

·      The Sunland Park Drive flyover entrance ramp to I-10 Eastbound and to US 85 Eastbound will close.

 

Crews will be installing new overhead exit signs.

 

I-10 East

 

Overnight

Thursday, April 4

9 pm to 6 am the following morning

 

·      I-10 Eastbound will close between the North Mesa exit ramp (Exit 11) and Executive Center Boulevard.

 

Detour: Motorists on I-10 Eastbound will exit at North Mesa (Exit 11) and follow North Mesa Street (SH 20) to Executive Center Boulevard. Motorists may use the Executive Center entrance ramp to re-enter I-10 Eastbound.

 

·      All entrance ramps to I-10 Eastbound will close between the North Mesa Street overpass and the Executive Center Boulevard overpass.

·      Paisano Drive (US 85) – in front of the auto dealerships – will close at Sunland Park Drive.

·      Crockett Street access to Paisano Drive (US 85) will close.

·      The Sunland Park Drive flyover entrance ramp to I-10 Eastbound will close.

·      The Resler Drive flyover entrance ramp to I-10 Eastbound will close.

 

Crews will be installing overhead exit signs along I-10 and conducting other work in the I-10 median.

 

I-10 West

 

27 HOURS

Sunday, April 7 at 3 am to Monday, April 8 at 6 am

 

·      I-10 Westbound will close completely at North Mesa Street (SH 20).

·      North Desert Boulevard will close between North Mesa Street (SH 20) and Thorn Avenue.

 

Completion Milestone:  Once this closure lifts, the new North Mesa entrance ramp to I-10 Westbound will be open.

 

TxDoT/Go10: Closure of I-10 in West EP Begins Sunday Morning

Here’s a look at the upcoming project closures, with some significant closures taking place Saturday and Sunday morning.

All lanes on I-10 Eastbound will close at Redd Road (Exit 9) this Sunday, Jan. 6. The closure will be in place for 27 hours while crews re-configure the lanes on I-10 Eastbound between North Mesa and Resler.

By 6 am on Monday, Jan. 7, motorists on I-10 on Eastbound should approach the North Mesa area with caution.

Full lists are below, along with highlights.

West Area Projects  |  GO10  |  Border West Expressway  |  East Area Projects

#1: GO10 Project – I-10 East at Redd

27-hour Closure
Sunday, Jan. 6, at 3 a.m. to Monday, Jan. 7 at 6 a.m.

  • I-10 eastbound will close between Redd Road and Sunland Park Drive.
  • The Redd Road entrance ramp to I-10 eastbound will close.
  • The North Mesa Street entrance ramp to I-10 eastbound will close.
  • Detour: Motorists will exit at Redd Road (Exit 9), follow Redd Road to Doniphan Drive, then follow Doniphan Drive to Sunland Park Drive. Motorists may re-enter I-10 eastbound via the Sunland Park Drive entrance ramp.
  • I-10 lane pattern change: Crews plan to change traffic lane patterns for motorists on I-10 eastbound between North Mesa Street (SH 20) and Resler Drive. Once the 27-hour closure lifts, motorists can expect to be driving on the main lanes of I-10 and be using the permanent eastbound Mesa entrance ramp.

#2: Hawkins/Viscount Operation Improvements Project(New Project)

Monday, Jan. 7 and Tuesday, Jan. 8
9 p.m. to 6 a.m. (two nights)

  • Complete closure on I-10 eastbound between the Hawkins overpass to the Viscount overpass
  • Eastbound Viscount exit ramp will be closed
  • Crews will be installing concrete barriers in the area

Wednesday, Jan. 9
9 p.m. to 6 a.m. (one night only)

  • Two right lane closures on I-10 eastbound between the Hawkins overpass to the Viscount overpass
  • Eastbound Viscount exit ramp will be closed
  • Crews will be striping in the area

Thursday, Jan. 10
9 p.m. to 6 a.m. (one night only)

  • Two left lane closures on Gateway Boulevard East between Hawkins to Viscount
  • Crews will be installing low profile barriers for long term lane closure

Starting January 7 and until further notice  

  • I-10 eastbound Viscount exit ramp will be closed
  • Left lane closure on Gateway Boulevard East between Hawkins and Viscount will be closed
  • Crews will be improving the Viscount exit ramp on I-10 eastbound

#3: El Paso Water Utilities Project

Sunday, Jan. 13 through Monday, Jan. 14
3 a.m. to 6 a.m.  (27-hour closure)

  • Complete closure on I-10 westbound at Mesa
  • Complete closure I-10 eastbound at Downtown
  • Crews will be installing a water line and chain link fence in the area

GO10 Project

North Mesa

Monday, Jan. 7, through Thursday, Jan. 10
9 p.m. each night to 6 a.m. each morning

  • The eastbound lanes on North Mesa Street (SH 20) – traveling in the direction from Osborne toward Remcon – will close between Osborne Drive and Remcon Circle.
  • The North Mesa exit ramp (Exit 11) from I-10 westbound will close.
  • The North Mesa entrance ramp to I-10 eastbound will close.
  • Note: Motorists who exit at the North Mesa exit ramp (Exit 11) from I-10 eastbound will only be able to turn right onto North Mesa Street (SH 20) at the signalized intersection.
  • Crews will continue upgrading pavement on North Mesa Street (SH 20).

 

Maintenance

Monday, Jan. 7 through Friday, Jan. 11
9 a.m. to 3 p.m. (throughout the day)

  • Eastbound Global Reach exit ramp on Spur 601 will be closed
  • Right lane closure on Cesar Chavez/Border Highway (Loop 375) eastbound at Fonseca
  • Eastbound Fonseca exit ramp will be closed

 

Border West Expressway

US 85

Monday, Jan. 7, to Friday, Jan. 11
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for bridge work

Doniphan

Saturday, Jan. 5, to Sunday, Jan. 6
6 a.m. to 6 p.m. (continuous full closure)

  • Westbound and eastbound from Racetrack to Paisano
  • Closure is needed for utility work

McNutt

Saturday, Jan. 5
6 a.m. to 6 p.m. (daily full closure)

  • Westbound and eastbound from Brickland to Executive Center Boulevard
  • Closure is needed for utility work

Oregon Street

Monday, Jan. 7, to Saturday, Jan. 19
5 a.m. to 9 a.m. (continuous closure)

  • Northbound from Loop 375 to 7th Street

Closure is needed for roadway work

LOCATION DURATION DESCRIPTION
I-10 East at Redd 27 HOURS

Sun., Jan. 6 at 3 am

until

Mon., Jan. 7 at 6 am

·      I-10 Eastbound will close between Redd Road and Sunland Park Drive.

·      The Redd Road entrance ramp to I-10 Eastbound will close.

·      The North Mesa Street entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists will exit at Redd Road (Exit 9), follow Redd Road to Doniphan Drive, then follow Doniphan Drive to Sunland Park Drive. Motorists may re-enter I-10 Eastbound via the Sunland Park Drive entrance ramp.

 

I-10 LANE PATTERN CHANGE: Crews plan to change traffic lane patterns for motorists on I-10 Eastbound between North Mesa Street (SH 20) and Resler Drive. Once the 27-hour closure lifts, motorists can expect to be driving on the main lanes of I-10 after several months of driving on the collector-distributor (CD) lanes.  The CD lanes run alongside I-10’s main lanes.

 

Note:  If this work activity is canceled, such as due to weather, then it will be re-scheduled to take place Jan. 13-14.

 

North Mesa

 

Overnight

Jan. 7-10

9 pm each night to 6 am each morning

 

·      The eastbound lanes on North Mesa Street (SH 20) – traveling in the direction from Osborne toward Remcon – will close between Osborne Drive and Remcon Circle.

·      The North Mesa exit ramp (Exit 11) from I-10 Westbound will close.

·      The North Mesa entrance ramp to I-10 Eastbound will close.

·      I-10 Westbound will close at Executive Center Boulevard (Exit 16). Motorists may re-enter I-10 Westbound via the Sunland Park entrance ramp.

 

Note:  Motorists who exit at the North Mesa exit ramp (Exit 11) from I-10 Eastbound will only be able to turn right onto North Mesa Street (SH 20) at the signalized intersection.

 

Crews will continue upgrading pavement on North Mesa Street (SH 20).

 

I-10 West at Sunland

 

27 HOURS

Sun., Jan. 20 at 3 am

until

Mon., Jan. 21 at 6 am

·      I-10 Westbound will close between Sunland Park Drive and North Mesa Street.

·      The Sunland Park entrance ramp to I-10 Westbound will close.

 

Detour:  Motorists on I-10 Westbound will exit at Sunland Park Drive (Exit 13), follow Sunland Park Drive to North Mesa Street (SH 20), then re-enter I-10 Westbound using the North Mesa entrance ramp.

 

I-10 LANE PATTERN CHANGE:  Crews plan to change traffic lane patterns for motorists on I-10 Westbound between Resler Drive and North Mesa Street (SH 20). Once the 27-hour closure lifts, motorists can expect to be driving on the main lanes of I-10 after several months of driving on the collector-distributor (CD) lanes.  The CD lanes run alongside I-10’s main lanes.

 

TxDoT, Go10 Closures, Detours for End of Year, Start of 2019

Here’s a look at project closures heading into the New Year. There are no scheduled closures over the holidays, but many into the New Year. Please review, take note and plan ahead.

GO10 Project

I-10 East at Redd

27-hour Closure
Sunday, Jan. 6, at 3 a.m. to Monday, Jan. 7 at 6 a.m.

  • I-10 eastbound will close between Redd Road and Sunland Park Drive.
  • The Redd Road entrance ramp to I-10 eastbound will close.
  • The North Mesa Street entrance ramp to I-10 eastbound will close.
  • Detour: Motorists will exit at Redd Road (Exit 9), follow Redd Road to Doniphan Drive, then follow Doniphan Drive to Sunland Park Drive. Motorists may re-enter I-10 eastbound via the Sunland Park Drive entrance ramp.
  • I-10 lane pattern change: Crews plan to change traffic lane patterns for motorists on I-10 eastbound between North Mesa Street (SH 20) and Resler Drive. Once the 27-hour closure lifts, motorists can expect to be driving on the mainlanes of I-10 after several months of driving on the collector-distributor (CD) lanes. The CD lanes run alongside I-10’s mainlanes.
  • Note: If this work activity is canceled, then it will be re-scheduled for Jan. 13-14.

 

North Mesa

Monday, Jan. 7, through Thursday, Jan. 10
9 p.m. each night to 6 a.m. each morning

  • The eastbound lanes on North Mesa Street (SH 20) – traveling in the direction from Osborne toward Remcon – will close between Osborne Drive and Remcon Circle.
  • The North Mesa exit ramp (Exit 11) from I-10 westbound will close.
  • The North Mesa entrance ramp to I-10 eastbound will close.
  • Note: Motorists who exit at the North Mesa exit ramp (Exit 11) from I-10 eastbound will only be able to turn right onto North Mesa Street (SH 20) at the signalized intersection.
  • Crews will continue upgrading pavement on North Mesa Street (SH 20).

 

Hawkins/Viscount Operation Improvements Project(New Project)

Monday, Jan. 7 and Tuesday, Jan. 8
9 p.m. to 6 a.m. (two nights)

  • Complete closure on I-10 eastbound between the Hawkins overpass to the Viscount overpass
  • Eastbound Viscount exit ramp will be closed
  • Crews will be installing concrete barriers in the area

Wednesday, Jan. 9
9 p.m. to 6 a.m. (one night only)

  • Two right lane closures on I-10 eastbound between the Hawkins overpass to the Viscount overpass
  • Eastbound Viscount exit ramp will be closed
  • Crews will be striping in the area

Thursday, Jan. 10
9 p.m. to 6 a.m. (one night only)

  • Two left lane closures on Gateway Boulevard East between Hawkins to Viscount
  • Crews will be installing low profile barriers for long term lane closure

Starting January 7 and until further notice  

  • I-10 eastbound Viscount exit ramp will be closed
  • Left lane closure on Gateway Boulevard East between Hawkins and Viscount will be closed
  • Crews will be improving the Viscount exit ramp on I-10 eastbound

 

Maintenance

Monday, Jan. 7 through Friday, Jan. 11
9 a.m. to 3 p.m. (throughout the day)

  • Eastbound Global Reach exit ramp on Spur 601 will be closed
  • Right lane closure on Cesar Chavez/Border Highway (Loop 375) eastbound at Fonseca
  • Eastbound Fonseca exit ramp will be closed

 

Border West Expressway

US 85

Wednesday, Jan. 2, and Thursday, Jan. 3
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for bridge work

Friday, Jan. 4, to Monday, Jan. 7
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for bridge work

Monday, Jan. 7, to Friday, Jan. 11
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for bridge work

Doniphan

Saturday, Jan. 5, to Sunday, Jan. 6
6 a.m. to 6 p.m. (continuous full closure)

  • Westbound and eastbound from Racetrack to Paisano
  • Closure is needed for utility work

McNutt

Saturday, Jan. 5
6 a.m. to 6 p.m. (daily full closure)

  • Westbound and eastbound from Brickland to Executive Center Boulevard
  • Closure is needed for utility work

Oregon Street

Monday, Jan. 7, to Saturday, Jan. 19
5 a.m. to 9 a.m. (continuous closure)

  • Northbound from Loop 375 to 7th Street
  • Closure is needed for roadway work

 

El Paso Water Utilities Project

Sunday, Jan. 13 through Monday, Jan. 14
3 a.m. to 6 a.m.  (57-hour closure)

  • Complete closure on I-10 westbound at Mesa
  • Complete closure I-10 eastbound at Downtown
  • Crews will be installing a water line and chain link fence in the area

Links to full list of closures: West Area Projects  |  GO10  |  Border West Expressway  |  East Area Projects

LOCATION DURATION DESCRIPTION
I-10 East at Redd

 

27 HOURS

Sunday, Jan. 6 at 3 am to Monday, Jan. 7 at 6 am

 

·      I-10 Eastbound will close between Redd Road and Sunland Park Drive.

·      The Redd Road entrance ramp to I-10 Eastbound will close.

·      The North Mesa Street entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists will exit at Redd Road (Exit 9), follow Redd Road to Doniphan Drive, then follow Doniphan Drive to Sunland Park Drive. Motorists may re-enter I-10 Eastbound via the Sunland Park Drive entrance ramp.

 

I-10 LANE PATTERN CHANGE: Crews plan to change traffic lane patterns for motorists on I-10 Eastbound between North Mesa Street (SH 20) and Resler Drive. Once the 27-hour closure lifts, motorists can expect to be driving on the main lanes of I-10 after several months of driving on the collector-distributor (CD) lanes.  The CD lanes run alongside I-10’s main lanes.

 

Note:  If this work activity is canceled, such as due to weather, then it will be re-scheduled to take place Jan. 13-14.

 

North Mesa Overnight

Jan. 7-10

9 pm each night to 6 am each morning

 

·      The eastbound lanes on North Mesa Street (SH 20) – traveling in the direction from Osborne toward Remcon – will close between Osborne Drive and Remcon Circle.

·      The North Mesa exit ramp (Exit 11) from I-10 Westbound will close.

·      The North Mesa entrance ramp to I-10 Eastbound will close.

 

Note:  Motorists who exit at the North Mesa exit ramp (Exit 11) from I-10 Eastbound will only be able to turn right onto North Mesa Street (SH 20) at the signalized intersection.

 

Crews will continue upgrading pavement on North Mesa Street (SH 20).

 

Go10/TxDoT Detours, Construction for Week of December 2

Next week, nighttime work and closures continue at I-10/North Mesa and I-10/Sunland Park.

The next 27-hour closure is scheduled for Sunday, Dec. 9 at Sunland Park with the goal of opening more lanes on the Sunland Park Drive main overpass.

All closures are subject to change or cancelation due to weather. Updates are posted on the GO 10 website, Twitter, and Facebook.

GO10

North Mesa

Overnight

Sunday, December 2 through Thursday, December 6

8 p.m. each night to 6 a.m. each morning

  • North Mesa Street (SH 20) will close in both directions between Remcon Circle and Osborne Drive.
  • All North Mesa entrance ramps and exit ramps (Exit 11) at I-10 will close.
  • South Desert Boulevard will close between McClintock Drive and North Mesa Street (SH 20).
  • McClintock Drive access to South Desert Boulevard will close.
  • Crews will be installing concrete pavement at the I-10/North Mesa intersections.

 

I-10 West at Sunland

Overnight

Sunday, December 2 through Thursday, December 6

9 p.m. each night to 6 a.m. each morning

  • I-10 westbound will close at the Sunland Park exit ramp (Exit 13).
  • Sunland Park Direct Connect closed – Utilize Paisano EBFR to access I-10
  • Detour:  Motorists on I-10 westbound will exit at Sunland Park and immediately re-enter I-10 at the next ramp.
  • Crews will be demolishing concrete pavement in the median of I-10 and hauling the debris away.

 

Sunland Park

27 HOURS

Sunday, December 9 at 3 a.m. until Monday, December 10 at 6 a.m.

  • Sunland Park Drive will close in both directions between Machuca Road and the mall signalized intersection.
  • All Sunland Park exit ramps and entrance ramps at I-10 will close.
  • Paisano Drive (US 85) westbound will close at McNutt Road (NM 273). Detour: Motorists on westbound Paisano Drive (US 85) will exit at McNutt Road (NM 273).
  • The Racetrack Drive entrance ramp to westbound Paisano Drive (US 85) will close.
  • LANE PATTERN CHANGE:  The goal is to open more traffic lanes on the Sunland Park Drive middle overpass.
  • WEATHER NOTE:  This work activity is dependent on weather temperatures and, therefore, is subject to change.

 

Border West Expressway

Executive Center Blvd.

Saturday, December 8 to Sunday, December 9

6 a.m. to 10 p.m. (Continuous full closure)

  • Westbound and eastbound from I-10 to US 85
  • Closure is needed for roadway work

 

US 85

Saturday, December 1 to Sunday, December 2

4 a.m. to 6 p.m. (Continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco St.
  • Closure is needed for bridge work

Monday, December 3 to Thursday, December 6

9 p.m. to 5 a.m. (nightly full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco St.
  • Closure is needed for bridge work

 

Mesa Park Interchange Project 

Executive

Friday, Dec. 7 through Monday, Dec. 10
8 p.m. to 6 a.m. (continuous closure)

  • I-10 eastbound Executive entrance ramp will be closed
  • Monday, Dec. 10 during the morning hours traffic will enter I-10 eastbound under a temporary ramp, while the old adjacent entrance ramp undergoes construction
  • Traffic Signal outage to occur on Saturday morning between 6 a.m. to 9 a.m.
  • To avoid congestion in the area, traffic should seek alternate routes through Schuster or Downtown entrance ramps.

 

Alameda Pedestrian Improvements Project

Monday, Dec. 3 (until further notice)
7 a.m. to 4 p.m.

  • Right lane closure along Alameda Avenue (SH 20) between Flicker Way and Delta Drive
  • Closure is necessary for proposed construction of extending existing box culvert, RCP (reinforced concrete pipe) culvert, pedestrian and driveway improvements
  • Crews will be placing portable traffic control barrier and delineators

 

Alameda Reconstruction Project

Monday, Dec. 3 through Friday, Dec. 21
8 p.m. to 5 a.m. and 9 a.m. to 3 p.m.

  • Alameda Avenue (SH 20) eastbound and westbound alternating lane closures between Padres Drive and Loop 375
  • Crews will be removing existing striping and install new striping

Monday, Dec. 3 through Friday, Dec. 21
8 a.m. to 3 p.m. and 8 p.m. to 5 a.m.

  • Alternating westbound lane closures between Alameda Avenue (SH 20) and Presa Place
  • Crews will be installing water main placement

 

Night Work  

Thursday, Dec. 6
9 p.m. to 3 a.m. (one night only)

  • Right lane closure on I-10 westbound between the Dallas exit ramp to the Mesa exit ramp
  • Westbound Dallas entrance ramp will be closed
  • Westbound Mesa exit ramp will be closed

 

Maintenance  

Monday, Dec. 3 through Friday, Dec. 7
9 a.m. to 3 p.m. (throughout the day)

  • Alternate lane closures on I-10 east and westbound between Stateline to Redd Road
  • Right lane closure on South Desert Boulevard between Thorn Avenue to Graphite Drive
  • Left lane closure on North Desert Boulevard between Artcraft to Transmountain
  • Northbound Artcraft entrance ramp to I-10 will be closed
  • Eastbound Global Reach exit ramp on Spur 601 will be closed
  • Alternate lane closures on Bomarc north and southbound between Gateway Boulevard East and Gateway Boulevard West, crews will be working under the overpass.

 

Guardrail Repair Project

Thursday, Nov. 29
9 a.m. to 3 p.m. (throughout the day)

  • Right lane closure on US 54 northbound between the Ellerthorpe entrance ramp to the Hondo Pass exit ramp
  • Northbound Ellerthorpe entrance ramp will be closed

Friday, Nov. 30
9 a.m. to 3 p.m. (throughout the day)

  • Left lane closure on Gateway Boulevard East between at the Copia intersection to Raynolds

Monday, Dec. 3
9 a.m. to 3 p.m. (throughout the day)

  • Left lane closure on Transmountain (Loop 375) eastbound between the Paseo del Norte entrance ramp to the Main Gap

Tuesday, Dec. 4
9 a.m. to 3 p.m. (throughout the day)

  • Alternate lane closure on Gateway Boulevard West between Airway Boulevard to Geronimo Boulevard
  • Robert E. Lee will be closed in the area

Wednesday, Dec. 5
9 a.m. to 3 p.m. (throughout the day)

  • Right lane closure on Ramp K (US 54 south to I-10 west) southbound between the Montana exit ramp to the Piedras exit ramp
  • Westbound Piedras exit ramp will be closed

Thursday, Dec. 6
9 a.m. to 3 p.m. (throughout the day)

  • Right lane closure on US 54 southbound between the Dyer exit ramp to the Spur 601 exit ramp
  • Southbound Ellerthorpe exit ramp will be closed
  • Southbound Spur 601 exit ramp will be closed
  • Alternate lane closure on Wyoming eastbound between Mesa Street and Kansas Street

Links to full lists of closures:

West Area Projects  |  GO10  |  Border West Expressway  |  East Area Projects

LOCATION DURATION DESCRIPTION
North Mesa

 

Overnight

Dec. 2-6

8 pm each night to 6 am each morning

 

·      North Mesa Street (SH 20) will close in both directions between Remcon Circle and Osborne Drive.

·      All North Mesa entrance ramps and exit ramps (Exit 11) at I-10 will close.

·      South Desert Boulevard will close between McClintock Drive and North Mesa Street (SH 20).

·      McClintock Drive access to South Desert Boulevard will close.

 

Crews will be installing concrete pavement at the I-10/North Mesa intersections.

 

I-10 West at Sunland

 

Overnight

Dec. 2-6

9 pm each night to 6 am each morning

 

·      I-10 Westbound will close at the Sunland Park exit ramp (Exit 13).

·      The Sunland Park flyover entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists on I-10 Westbound will exit at Sunland Park and immediately re-enter I-10 at the next ramp.

 

Crews will be demolishing concrete pavement in the median of I-10 and hauling away debris.

 

Sunland Park

 

27 HOURS

Dec. 9 at 3 am

until

Dec. 10 at 6 am

 

·      Sunland Park Drive will close in both directions between Machuca Road and the mall signalized intersection.

·      All Sunland Park exit ramps and entrance ramps at I-10 will close.

·      Paisano Drive (US 85) westbound will close at McNutt Road (NM 273). Detour: Motorists on westbound Paisano Drive (US 85) will exit at McNutt Road (NM 273).

·      The Racetrack Drive entrance ramp to westbound Paisano Drive (US 85) will close.

 

LANE PATTERN CHANGE:  The goal is to open more traffic lanes on the Sunland Park Drive middle overpass.

 

WEATHER NOTE:  This work activity is dependent on weather, therefore, is subject to change.

 

Go10/TxDoT Closures, Detours for Week of November 25

There are a couple of activities to watch for on GO 10 this week.  First off the changes to traffic lane patterns may be coming to the exit ramps at North Mesa.

Crews continue to try to open more traffic lanes on the Sunland Park Drive middle overpass. (This work depends on weather and may be rescheduled.)

More information on the upcoming work is below:

LOCATION DURATION DESCRIPTION
North Mesa

 

Overnight

Nov. 26 and 27

8 pm each night to 6 am each morning

 

·      North Mesa Street (SH 20) will close in both directions between Remcon Circle and Osborne Drive.

·      All North Mesa entrance ramps and exit ramps (Exit 11) at I-10 will close.

·      South Desert Boulevard will close between McClintock Drive and North Mesa Street (SH 20).

·      McClintock Drive access to South Desert Boulevard will close.

 

LANE PATTERN CHANGE:  Crews will be re-configuring traffic lanes on the eastbound and westbound North Mesa exit ramps.

 

North Mesa

 

Overnight

Nov. 27-29

8 pm each night to 6 am each morning

 

·      One lane in each direction on North Mesa Street (SH 20) will close between Remcon Circle and Osborne Drive.

·      North Mesa exit ramp (Exit 11) from I-10 Eastbound will close.

·      South Desert Boulevard will close between McClintock Drive and North Mesa Street (SH 20).

·      McClintock Drive access to South Desert Boulevard will close.

 

Crews will be conducting pavement work.

 

Sunland Park

 

Overnight

Nov. 27-29

8 pm each night to 6 am each morning

·      Sunland Park Drive will close in both directions between Machuca Road and the mall signalized intersection.

·      The Sunland Park exit ramp (Exit 13) from I-10 Westbound will close.

·      The Sunland Park exit ramp (Exit 13) from I-10 Eastbound will be open; however, motorists will not be able to turn left onto Sunland Park Drive.

·      Paisano Drive (US 85) westbound will close at McNutt Road (NM 273). Detour: Motorists on westbound Paisano Drive (US 85) will exit at McNutt Road (NM 273).

·      The Racetrack Drive entrance ramp to westbound Paisano Drive (US 85) will close.

 

Crews will be constructing the median and a sidewalk.

 

Sunland Park

 

27 HOURS

Sunday, Dec. 2 at 3 am

until

Monday, Dec. 3 at 6 am

 

·      The exit ramps and entrance ramps at the I-10/Sunland Park interchange will close.

·      Sunland Park Drive will close in both directions between Machuca Road and the mall signalized intersection.

·      Paisano Drive (US 85) westbound will close at McNutt Road (NM 273). Detour: Motorists on westbound Paisano Drive (US 85) will exit at McNutt Road (NM 273).

·      The Racetrack Drive entrance ramp to westbound Paisano Drive (US 85) will close.

 

LANE PATTERN CHANGE:  The goal is to open more traffic lanes on the Sunland Park Drive middle overpass.

 

WEATHER NOTE:  This work activity is dependent on weather temperatures and may be re-scheduled.

 

TxDoT/Go10 Closures, Detours for Week of June 17

If Resler Drive is your usual I-10 exit, then pay attention – crews are exploring ways to avoid closing the Resler Drive exit ramp for several weeks starting sometime this month or early next month.

Officials say, “If there is no way to avoid it, the goal will be to restore the exit ramp before the new school year starts. Be prepared: starting considering your alternate routes.”

West Area Project Closures  |  East Area Project Closures  |  Border West Expressway Closures  |  GO10 Closures

Doniphan Drive

Friday, June 22 to Wednesday, June 27
9 p.m. to 5 a.m. (continuous full closure)

  • Eastbound and westbound from Racetrack to Paisano
  • Closure is needed for painting barrier and roadway work

US 85 (Paisano)

Friday, June 22 to Sunday, June 24
9 p.m. to 6 p.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap forming

Mall Braided Ramps Project

Monday, June 18 (complete closure)
9 p.m. to 5 a.m. (overnight)

  • Gateway Boulevard westbound closure between McRae Boulevard and Airway Boulevard
  • Entrance and exit ramps between McRae Boulevard and Airway Boulevard may close up to one hour before scheduled closure
  • Crews will be pouring concrete for a bridge deck

Mesa Park Project

Monday, June 18 through Thursday, June 21
9 p.m. to 5 a.m. (nightly)

  • Complete closure of I-10 westbound.
  • Traffic will exit at Schuster and re-enter at Sunland Park

Crews will be repaving shoulder, restriping and working on existing roadway

Westway Project Phase III

Wednesday, June 20
9 p.m. to 5 a.m. (one night only)

  • Complete closure of I-10 in both directions
  • Traffic will exit and enter at Vinton
  • Crews will be bringing in beams for the turnaround bridge under construction

Monday, June 18 through Friday, June 22
9 a.m. to 4 p.m. (throughout the day)

  • Complete closure on North Desert Boulevard between Anthony and Vinton
  • Northbound Vinton entrance ramp to I-10 west will be closed

 

US 54

Monday, June 18 through Friday, June 22
9 p.m. to 5 a.m. (nightly)

  • Complete closure on US 54 southbound between the Hercules exit to the Dyer entrance ramp
  • Detour: Southbound traffic will exit at the Hercules exit ramp and renter US 54 at the Dyer entrance ramp

Crews will be repairing the pedestrian bridge in the area

Spalling Repair Project

Monday, June 18 through Thursday, June 21
9 p.m. to 5 a.m. (nightly)

  • Two right lane closures on I-10 eastbound at the Raynolds overpass
  • Ramp D (US 54 south to I-10 east) will be closed
  • Ramp J (I-110 (Juarez) to I-10 east will be closed
  • Right lane closure on Raynolds Street at Gateway Boulevard east
  • Ramp Z (Paisano entrance ramp to Ramp J to I-10 east) Newest Ramp by the Zoo

Maintenance

Monday, June 18 through Friday, June 22
9 a.m. to 3 p.m. (throughout the day)

  • Right lane closure on Cesar Chavez/Border Highway (Loop 375) westbound between Fonseca to the Bridge of the Americas
  • Ramp O (Cesar Chavez/Border Highway (Loop 375) west to US 54 north)
  • Alternate entrance and exit ramp closures on Cesar Chavez/Border Highway (Loop 375) east and westbound between Fonseca to Zaragoza
  • Ramp on US 54 south to Spur 601 east will be closed
  • Right lane closure on US 54 southbound between Pershing to Yandell
  • US 54 northbound Pershing entrance ramp will be closed
LOCATION DURATION DESCRIPTION
I-10 West at Sunland

 

27 HOURS

Sunday, June 17 (Father’s Day)

3 am to 6 am the next morning

 

·      I-10 Westbound will close completely between Sunland Park (Exit 13) and North Mesa Street (SH 20).

·      North Mesa Street (SH 20) will close completely in both directions between Osborne Drive and Remcon Circle.

 

Detour:  Traffic on I-10 Westbound will exit at Sunland Park (Exit 13), follow Sunland Park Drive to North Mesa Street (SH 20), then follow North Mesa Street (SH 20) to re-enter I-10 Westbound. Traffic on North Mesa Street should follow the detour signs.

 

NOTICE:  This 27-hour closure will result in several changes to traffic lane patterns along I-10 Westbound near Resler Drive. Motorists exiting I-10 Westbound at North Mesa (Exit 11) will also notice the signalized intersection at North Mesa Street (SH 20) will be shifted to the left.

 

I-10 Both Directions at Sunland

 

Overnight

(The night of Father’s Day)

Sunday, June 17

9 pm to 6 am

 

·      I-10 Westbound will be closed completely between Sunland Park (Exit 13) and North Mesa Street (SH 20).

·      North Mesa Street (SH 20) will be closed completely in both directions between Osborne Drive and Remcon Circle.

·      I-10 Eastbound will close completely between Sunland Park (Exit 13) and Executive Center Boulevard. Motorists will be detoured onto Doniphan Drive.

·      Both Sunland Park entrance ramps to I-10 Eastbound will close.

·         Paisano Drive (US 85) will close at Sunland Park Drive.

·         Crockett Street access to Paisano Drive (US 85) will close.

·         The Resler Drive flyover ramp to I-10 Eastbound will close.

 

I-10 East at Sunland Overnight

June 18-21

9 pm each night to 6 am each morning

 

·      I-10 Eastbound will close completely between Sunland Park (Exit 13) and Executive Center Boulevard. Motorists will be detoured onto Doniphan Drive.

·      Both Sunland Park entrance ramps to I-10 Eastbound will close.

·      Paisano Drive (US 85) will close at Sunland Park Drive.

·      Crockett Street access to Paisano Drive (US 85) will close.

·      The Resler Drive flyover ramp to I-10 Eastbound will close.

 

I-10 West at Mesa

 

27 HOURS

Sunday, July 1

3 am to 6 am the next day

 

·      I-10 Westbound will close completely at North Mesa Street (Exit 11). Motorists will exit at North Mesa (Exit 11 and follow the frontage to re-enter I-10 at the next entrance ramp.

·      North Mesa Street (SH 20) will close completely in both directions under the I-10 overpass. All entrance ramps to I-10 from North Mesa Street will be open. Follow the detour signs.

·      NOTE: Crews could open North Mesa Street (SH 20) as early as 4 pm on July 1.

 

Crews will be placing bridge deck panels and pouring concrete onto the new I-10 Westbound overpass.

  

Curing Time: For several hours during this closure, it may seem as though no work is taking place; but in fact, the freshly poured concrete will be curing (drying and hardening).

 

Emergence June 11 – Sep 11, 2020 728
EMERGENCE MINDFUL 728.90
Get Shift Done 728
ENTERPRISE 728
Utep Football Generic 728
Covid-19 Fund 728
Mountains 728
PBP_728
Spring Training 728
john overall 728×90
TRLA_728
Elizabeth 728