window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Friday , October 19 2018
Home | Tag Archives: freeway construction el paso

Tag Archives: freeway construction el paso

TxDoT/Go10 Closures, Detours for February 11th

No easy way to put it, so drivers be ready, we’re talking closures & detours for the next few days and weeks.

There are several full closures of I-10 coming up:

  • Feb 11             I-10 East at Redd closes for 24 hours

  • Feb 12-14        I-10 East at North Mesa closes at night

  • Feb 15             I-10 in BOTH directions closes at night

  • Feb 25             I-10 West at Resler closes for 27 hours

In addition, for any motorists who plan to travel on I-10 or US 54 Sunday – TAKE NOTE!

A closure that was originally scheduled for a Sunday overnight closure is now scheduled for a daytime closure. There are now four closures scheduled for I-10 and one on US 54. Four of these five are daytime closures. The snapshot is below.

As a reminder anyone can sign up for traffic alerts via drivetexas.org. Follow us on Twitter and register for GO10 alerts.

US 54 Closure:

Project: US 54 Widening and Illumination

Sunday, Feb. 11, 7 a.m. to Monday, Feb. 12, 5 a.m. 

  • Complete closure on US 54 northbound between Hondo Pass and the Diana exit ramp
  • Northbound Hondo Pass entrance ramp will be closed
  • Northbound Diana exit ramp and Diana Northbound on ramp will be closed

Why?

Crews will be removing overhead sign bridges in the area, placing closure placards and closing affected ramps with barrier. Affected ramps will be closed for an estimated six months. Traffic will be detoured through the Gateway. More details on the project: http://www.txdot.gov/inside-txdot/media-center/local-news/el-paso/037-2018.html

 

IH-10 Closures:

Project: Border West Expressway

Sunday, Feb. 11, 5 a.m. to 5 p.m.

  • IH-10 Eastbound, three right lanes from Executive entrance ramp to Schuster Ave.

Why? Closure is needed for structure work. Crews will be placing a pump truck on the main lanes to pour three spans of bridge deck between the steel caps.

 

Project: GO10

Sunday, Feb. 11, 5 a.m.-Monday, Feb, 12, 5 a.m.

  • I-10 Eastbound will be closed at Redd Road (Exit 9)

Why? Crews will be working on a traffic switch in the area. Drivers will be detoured onto South Desert Boulevard to the North Mesa Street on-ramp to I-10 Eastbound.

 

Project: I-10/Americas – Phase IV

Sunday, Feb. 11, 7 a.m. to 3 p.m.

  • I-10 westbound between Eastlake and Zaragoza overpass
  • I-10 westbound to northbound connector

Why? This project is nearing completion and crews will be removing portable concrete traffic barriers.

 

Project: Braided Ramps

Sunday, Feb. 11, 9 p.m. to 5 a.m. (overnight)

  • IH-10 westbound between Viscount overpass to Airway overpass
  • Viscount overpass to Airway overpass all entrance and exit ramps

Why? Crews will be installing metal beam guard fence and working on illumination. The closure will repeat Sunday-Thursday until March 1.

LOCATION DURATION DESCRIPTION
Paisano (US 85) @ Sunland

 

 

Ongoing – 24/7

Jan. 15 thru Mar. 4

 

·      Paisano Drive (US 85) will remain closed for approximately 300 feet starting at Sunland Park Drive.

·      Sunland Park Drive will be kept to two lanes starting at Constitution Drive all the way up to the Paisano Drive (US 85) intersection.

 

To help mitigate roadway congestion in this area, motorists should consider using an alternate entrance ramp to I-10 Eastbound.

 

Business Access: Motorists may access area businesses by using Sunland Park Drive, Constitution Drive and Crockett Street.

 

I-10 East @ Redd

 

 

24-HOUR CLOSURE

Sunday, Feb. 11

5 am to 5 am the next morning

 

·      I-10 Eastbound will close completely between Redd Road (Exit 9) and the North Mesa Street overpass.

·      The Redd Road entrance ramp to I-10 Eastbound will close.

 

Detour:  Drivers on I-10 Eastbound will exit at Redd Road (Exit 9) then take the South Desert Blvd frontage road to the North Mesa St entrance ramp to I-10 Eastbound.

 

Crews will be moving barrier and re-configuring lanes on the I-10 overpass at North Mesa (SH 20).

 

Heads Up: This work is in preparation for a 27-hour closure of I-10 Westbound on Sunday, Feb. 25.

 

 

North Mesa

 

Daytime

Feb. 12-23

9 am to 4 pm weekdays only, as needed

 

·      The right lane on North Mesa Street (SH 20) will close from North Desert Blvd to Osborne Drive.

 

Sunland Park

 

Daytime

Feb. 12

9 am to 4 pm

 

·      The Sunland Park entrance ramp to I-10 Westbound will close.

 

 

Sunland Park

 

Daytime

Feb. 13-16

9 a.m. to 4 p.m. daily

 

·      The right lane on Sunland Park Drive (northbound, moving toward South Mesa Hills Drive) will close for approximately 500 feet starting at Paisano Drive (US 85).

 

 

Paisano (US 85)

 

Overnight

Feb. 12 and Feb. 13

9 pm each night to 6 am each morning

 

·      The Paisano Drive (US 85) entrance ramp to I-10 Eastbound – in front of the auto dealerships – will close.

·      Crockett Street access to Paisano Drive (US 85) will close.

·      All access points from Sunland Park Drive to Paisano Drive (US 85) will close.

·      I-10 Eastbound will be closed completely between North Mesa St (Exit 11) and Executive Center Blvd.

 

Detour: I-10 Eastbound traffic will exit at North Mesa Street (Exit 11), then take North Mesa Street (SH 20) to Executive Center Boulevard’s entrance ramp to I-10 Eastbound.

I-10 East @ N Mesa

 

Overnight

Feb. 12-15

9 pm each night to 6 am each morning

 

·      I-10 Eastbound will close completely between North Mesa Street (Exit 11) and Sunland Park Drive.

·      The North Mesa Street entrance ramp to I-10 Eastbound will close.

·      The Resler Drive entrance ramp to I-10 Eastbound will close.

·      The Sunland Park Drive flyover entrance ramp to I-10 Eastbound will close.

 

Detours:  On Feb. 12 and 13, motorists on I-10 Eastbound will exit at North Mesa Street (Exit 11), then take North Mesa Street to Executive Center Boulevard’s entrance ramp to I-10 Eastbound.

On Feb. 14 and 15, motorists on I-10 Eastbound will exit at North Mesa St (Exit 11), then take North Mesa St (SH 20) to Doniphan Drive, then take Sunland Park Drive to the I-10 Eastbound entrance ramp.

 

I-10 West @ Executive

 

Overnight

Feb. 15

9 pm to 6 am the next morning

 

·      I-10 Westbound will close completely at Executive Center Boulevard (Exit 16).

·      The Schuster/UTEP entrance ramp to I-10 Westbound will close.

 

Detour:  Traffic on I-10 Westbound will exit at Executive Center Blvd (Exit 16), take Executive Center Blvd to North Mesa Street (SH 20), then take North Mesa Street to Sunland Park Drive. Motorists may re-enter I-10 Westbound using the Sunland Park Drive entrance ramp.

 

Note:  This closure overlaps with a Feb. 15 closure of I-10 Eastbound at North Mesa (Exit 11).

 

I-10 West @ Resler

 

27-HOUR CLOSURE

Sunday, Feb. 25

3 am to 6 am the next morning

 

·      I-10 Westbound will close completely at Resler Drive (Exit 12).

·      North Mesa Street (SH 20) will close completely in both directions under the I-10 overpass.

·      The North Mesa westbound exit ramp will close.  All other ramps at I-10/North Mesa will be open.

 

Crews will be re-configuring the traffic lanes of I-10 Westbound and demolishing the I-10 Westbound overpass at North Mesa Street (SH 20).

 

MARCHFEST 728X90