window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Wednesday , December 19 2018
JustLikeThat728
TESTIFY 728X90
FootballShowcase728
SUNLANDPARK 728X90
MEDIA FEST 728
Bordertown Undergroun Show 728
Home | Tag Archives: freeway construction in el paso

Tag Archives: freeway construction in el paso

TxDoT/Go10 Closures, Detours for Week of September 9

This Sunday’s 27-hour closure of I-10 East at Redd Road will result in a change to traffic lane patterns on I-10 East at North Mesa Street.

Link to full lists of closures: West Area Projects  |  GO10  |  Border West Expressway  |  East Area Projects

US 54 Widening and Illumination Project

Sunday, September 9

11:00 p.m. to 2:00 a.m.

  • US-54 southbound will close completely from Hercules to Dyer
  • Crews will be power washing the pedestrian bridge to prepare it for painting.

 

Monday, September 10

9:00 p.m. to 5:00 a.m.

  • US-54 southbound will close completely from Hercules to Dyer
  • Crews will be painting the repaired pedestrian bridge.

 

Tuesday, Sept. 18

9 p.m. to 5 a.m. (one night only)

  • Complete closure on US 54 southbound between the Transmountain/Woodrow Bean exit ramp to the Hondo Pass overpass
  • DETOUR: US 54 southbound traffic will need to exit at the Transmountain/Woodrow Bean exit ramp and re-enter at the Hondo Pass entrance ramp
  • Crews will be working on opening the “New” ramp and closing the existing exit ramp between Transmountain and Diana.

 

Wednesday, Sept. 19

9 p.m. to 5 a.m. (one night only)

  • Complete closure on US 54 northbound between the Hondo Pass exit ramp to the Transmountain exit ramp
  • DETOUR: US 54 northbound traffic will need to exit at Hondo Pass and re-enter at the Transmountain/Woodrow Bean entrance ramp
  • Crews will be working on opening the “New” exit ramp between Diana and Transmountain.

 

UPCOMING 50-hour closures

3:00 a.m. Saturday, September 22 through 5:00 a.m. Monday, September 24

  • US-54 northbound will close completely at Hondo Pass
  • Crews will be pouring bridge deck over Diana Drive
  • Detour: Traffic will exit at Hondo Pass and reenter after Transmountain

 

3:00 a.m. Saturday, September 29 through 5:00 a.m. Monday, October 1

  • US-54 southbound will close completely at Transmountain
  • Crews will be pouring bridge deck over Diana Drive
  • Detour: Traffic will exit at Transmountain and reenter after Hondo Pass

Maintenance

Monday, Sept. 10 through Friday, Sept. 14
9 a.m. to 3 p.m. (throughout the day)

  • US 54 northbound Sun Valley exit ramp will be closed
  • Right lane closure on Transmountain/Woodrow Bean (Loop 375) eastbound between McCombs to Bomarc
  • Right lane closure on I-10 westbound between Airway to Geronimo
  • I-10 westbound Geronimo exit ramp will be closed
  • I-10 westbound Airway entrance ramp will be closed
  • Left lane closure on Loop 375 between the museum to Tom Mays for shoulder work (mile markers 14-21)
  • Right lane closure on Spur 601 east and westbound between Fred Wilson to Loop 375

Westway Project Phase III

Monday, Sept. 10 through Wednesday, Sept. 12

  • Westway on-ramp to I-10 westbound will be closed.

Loop 375 Border Highway

Friday, Sept. 7 to Monday, Sept. 10
9 p.m. to 5 a.m. (continuous full closure)

  • Eastbound and westbound from US 54 to Oregon Street
  • Closure is needed for roadway work

US 85

Friday, Sept. 7 to Monday, Sept. 10
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work

Friday, Sept. 14 to Sunday, Sept. 16
9 p.m. to 6 p.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work

McNutt

Friday, Sept. 14 to Monday, Sept. 17
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Doniphan to Brickland Street
  • Closure is needed for roadway work

Doniphan Drive

Friday, Sept. 7 to Monday, Sept. 10
9 p.m. to 5 a.m. (continuous full closure)

  • Eastbound and westbound from Racetrack to Paisano
  • Closure is needed for roadway work

US 62

Friday, Sept. 14 to Monday, Sept. 17
9 p.m. to 5 a.m. (continuous full closure)

  • Eastbound and westbound from Cole Street to Saint Vrain Street
  • Closure is needed for roadway work

Mall Braided Ramps Project

Sunday, Sept. 9 (complete closure)
9 p.m. to 5 a.m. (overnight)

  • Gateway Boulevard eastbound complete frontage road closure between Airway Boulevard and Hawkins Boulevard
  • Crews will be removing portable concrete traffic barrier

Monday, Sept. 10 (complete closure)
9 p.m. to 5 a.m. (overnight)

  • I-10 eastbound complete closure between Airway Boulevard and Hawkins Boulevard
  • Crews will be removing portable concrete traffic barrier
LOCATION DURATION DESCRIPTION
I-10 East at Redd

 

27 HOURS

Sunday, September 9 at 3 am until Monday, September 10 at 6 am

 

 

·      I-10 Eastbound will close completely at Redd Road (Exit 9).

·      The Redd Road entrance ramp to I-10 Eastbound will close.

·      The Artcraft Road entrance ramp to I-10 Eastbound will close.

·      The North Mesa Street entrance ramp to I-10 Eastbound will close.

·      The Resler flyover entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists on I-10 Eastbound will exit at Redd Road (Exit 9), then take Doniphan Drive to Sunland Park Drive. The Sunland Park entrance ramp to I-10 will be open.

 

Business Access:  Access to area businesses will be open via South Desert Boulevard. Through traffic will not be allowed to use South Desert Boulevard as an alternate route.

 

Crews will be moving barrier walls and re-striping lanes on I-10 Eastbound.

 

IMPORTANT:  After the closure lifts, motorists on I-10 Eastbound at North Mesa Street (SH 20) will experience a change in traffic lane patterns.

 

I-10 Both Directions

 

Overnight

Sunday, September 9

8 pm to 6 am

 

·      I-10 Eastbound will be close completely at Redd Road (Exit 9). Detour:  Motorists on I-10 Eastbound will exit at Redd Road (Exit 9), then take Doniphan Drive to Sunland Park Drive. The Sunland Park entrance ramp to I-10 Eastbound will be open.

·      Sunland Park Drive will close completely in both directions at the I-10 overpass.

·      The Artcraft Road entrance ramp to I-10 Eastbound will close.

·      The Redd Road entrance ramp to I-10 Eastbound will close.

·      The North Mesa entrance ramp to I-10 Eastbound will close.

·      The Resler flyover entrance ramp to I-10 Eastbound will close.

·      The Sunland Park flyover entrance ramp to I-10 Eastbound will close.

·      I-10 Westbound will close completely at Sunland Park (Exit 13). Detour: Motorists on I-10 Westbound will exit at Sunland Park (Exit 13) and follow it to North Mesa Street (SH 20). Motorists may re-enter I-10 Westbound at the North Mesa entrance ramp.

·      The Sunland Park entrance ramp to I-10 Westbound will close.

 

Business Access:  Access to area businesses will be open via South Desert Boulevard. Through traffic will not be allowed to use South Desert Boulevard as an alternate route.

 

Crews will be moving barrier walls and re-striping lanes on I-10 Eastbound. Crews will also be pouring concrete onto the I-10 overpass at Sunland Park Drive.

 

IMPORTANT:  After the closure lifts, motorists on I-10 Eastbound at North Mesa Street (SH 20) will experience a change in traffic lane patterns.

 

North Mesa

 

Overnight

September 10-13

9 pm each night to 6 am each morning

 

·      On North Mesa Street (SH 20), the lanes for traffic headed toward Doniphan Drive will close between North Desert Boulevard and Osborne Drive. Detour: Motorists should follow North Desert Boulevard to use the Thorn Avenue overpass.

·      The North Mesa exit ramp from I-10 Eastbound will close. Detour: Motorists should use the Redd Road exit ramp.

·      South Desert Boulevard will be closed between McClintock Drive and North Mesa Street. 

 

Crews will be paving a section of North Mesa Street (SH 20).  For some time, it may appear as though no work is taking place; but, in fact, the new pavement requires undisturbed curing time.

 

I-10 Both Directions

 

Overnight

September 10-13

8 pm each night to 6 am each morning

 

·      I-10 in both directions will close completely at Sunland Park (Exit 13).  Detours:  Motorists on I-10 Eastbound will exit at Sunland Park (Exit 13), follow Sunland Park Drive to Doniphan Drive, then follow Doniphan Drive to Executive Center Boulevard. The Executive Center entrance ramp to I-10 Eastbound will be open. Motorists on I-10 Westbound will exit at Sunland Park (Exit 13), follow it to North Mesa Street (SH 20), then re-enter I-10 Westbound using the North Mesa entrance ramp.

·      Sunland Park Drive will close completely in both directions at the I-10 overpass.  Detour: Motorists should use an alternate route or follow the detour signs in place.

·      The Sunland Park flyover entrance ramp to I-10 Eastbound will close.

·      The Resler flyover entrance ramp to I-10 Eastbound will close.

·      Crockett Street access to Paisano Drive (US 85) will close.

 

Crews will be pouring bridge deck onto the center Sunland Park Drive overpass.

North Mesa 27 HOURS

Sunday, September 30 at 3 am to Monday, October 1 at 6 am

 

·      North Mesa Street (SH 20) will close completely in both directions at the I-10 overpass. Detour:  Motorists should use an alternate route such as Thorn Avenue or Redd Road.

·      All North Mesa entrance ramps and exit ramps (Exit 11) to and from I-10 will close. Detour:  Motorists should use alternate ramps at Redd Road or Sunland Park Drive.

·      McClintock Street access to South Desert Boulevard will close.

·      Graphite Drive access to South Desert Boulevard will close.

·      South Desert Boulevard will close between Thorn Avenue and North Mesa Street (SH 20)

 

Crews will be moving barrier walls and re-striping lanes.

 

IMPORTANT:  After the closure lifts, motorists on North Mesa Street (SH 20) at the I-10 overpass will experience a change in traffic lane patterns.  Motorists should plan for extra travel time and approach the area cautiously and patiently.

 

TESTIFY 728X90
Bordertown Undergroun Show 728
JustLikeThat728
MEDIA FEST 728
SUNLANDPARK 728X90
FootballShowcase728