window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Tuesday , October 16 2018
SUNLANDPARK 728X90
GREAT AMERICAN READ 728X90
728×90 pluck b
JustLikeThat728
TESTIFY 728X90
Home | Tag Archives: road work el paso

Tag Archives: road work el paso

Go10/TxDoT Closure for Week of August 20

Both TxDoT and EPE Crews will be busy this week, from sites stretching from Downtown El Paso to poins east and west.

First off, in order to allow El Paso Electric (EPE) crews to safely place electrical cables through the newly repaired utility bridge, consecutive overnight closures will be required.

Commuters can expect the following I-10 eastbound and westbound closures in downtown El Paso on the following dates and times:

  • Monday, August 20, 2018 – 8 p.m. to 6 a.m.
  • Tuesday, August 21, 2018 – 8 p.m. to 6 a.m.
  • Wednesday, August 22, 2018 – 8 p.m. to 6 a.m.
  • Thursday, August 24, 2018 – 8 p.m. to 6 a.m.

Intermittent lane closures on Wyoming Ave, N. Stanton and E. Yandell will continue through the end of August. Final repairs of the manholes located on Wyoming and E. Yandell (next to the Howdy’s Food Mart) will continue through September.

Look for additional closures overnight next week required for utility work once the bridge is repaired.  Also motorist need to prepare for the 27-hour closure on I-10 coming up for a traffic pattern change.

Don’t forget to follow us on Twitter.

US 85

Monday, Aug. 20 to Wednesday, Aug. 22
9 p.m. to 5 a.m. (nightly full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work

 

Friday, Aug. 24 to Monday, Aug. 27
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work

 

McNutt

Friday, Aug. 17 to Sunday, Aug. 19
9 p.m. to 9 p.m. (continuous full closure)

  • Westbound and eastbound from Doniphan to Brickland Street
  • Closure is needed for traffic switch

 

I-10

Thursday, Aug. 30
9 p.m. to 5 a.m.

  • Eastbound left lane from Schuster Avenue to Executive Center Boulevard
  • Closure is needed for roadway repair

 

Spalling Repair Project

Monday, Aug. 20 through Thursday, Aug. 23
9 p.m. to 5 a.m. (one night only)

  • I-10 westbound at Paisano – 2 right lanes closed
  • I-10 westbound Paisano exit ramp closed
  • I-10 westbound Trowbridge entrance ramp closed
  • Crews will be repairing spalled concrete pavement

 

Concrete Repair Project

Sunday, Aug. 19
9 p.m. to 5 a.m. (one night only)

  • I-10 eastbound at Paisano – 3 left lanes closed
  • I-10 eastbound at Raynolds entrance ramp will be closed
  • I-10 westbound at Paisano – 2 left lanes closed
  • Crews will be repairing concrete barriers in the area

 

Cesar Chavez Maintenance Overlay Project

Monday, Aug. 13 through Friday, Aug. 31
9 a.m. to 4 p.m.

  • Cesar Chavez Border Highway (Loop 375) alternating eastbound and westbound closures between Fonseca entrance ramp and US 54 – Paisano exit ramp
  • Crews will be pouring hot mix and overlay

 

Sidewalk Damage Repair

Monday, Aug. 20 to Friday, Aug. 24
9 p.m. to 4 a.m.

  • Horizon Boulevard (FM 1281) southbound right lane closure between Gateway East Boulevard and Thunder Road
  • Crews will be repairing damaged sidewalks
  • Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.

West Area Project Closures  |  Border West Expressway Closures  |  East Area Project Closures  |  GO 10 Project Closures

LOCATION DURATION DESCRIPTION
North Mesa Street

 

Overnight

August 19 and 20

 

8 pm to 6 am nightly

 

·      The North Mesa exit ramp (Exit 11) from I-10 Westbound will close.

·      North Mesa Street (SH 20) – in the direction traveling toward Doniphan Drive – will close.

 

North Mesa Street

 

 

Continuous

Monday, August 20 at 9 am until Friday, August 24 at 3 pm

 

·      The right lane on North Mesa Street (SH 20) – in the direction traveling toward Doniphan Drive – will close between Remcon Circle and Osborne Drive.

 

Bus Service:  The Sun Metro bus stop on North Mesa Street (SH 20) at Osborne Drive will be closed during this work activity. An alternate bus stop is available on North Mesa Street (SH 20) at Crossroads Drive.

 

I-10 West at Sunland

 

Overnight

August 20-23

9 pm to 6 am nightly

 

·      I-10 Westbound will close at Executive Center Boulevard (Exit 16).

·      Sunland Park Drive will close in both directions at the I-10 overpass.

·      The Sunland Park entrance ramp to I-10 Westbound will close.

 

Detour: Motorists on I-10 Westbound will exit at Executive Center (Exit 13), then follow it to North Mesa Street (SH 20). Follow the detour signs along North Mesa Street (SH 20) to re-enter I-10 Westbound.

IMPORTANT: By the morning of Friday, August 24 motorists on I-10 Westbound should slow down as they approach the North Mesa area because lane patterns will be shifted.

 

I-10 East at Sunland

 

Overnight

August 21-23

9 pm to 6 am nightly

 

·      I-10 Eastbound will close at Sunland Park Drive (Exit 13).

·      The Sunland Park entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists on I-10 Eastbound will exit at Sunland Park (Exit 13). Follow the detour signs.

 

I-10 East at Redd

 

27 HOURS

Sunday, August 26 at 3 am until Monday, August 27 at 6 am

 

·      I-10 Eastbound will close at Redd Road (Exit 9).

·      The Redd Road entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists on I-10 Eastbound will exit at Redd Road (Exit 9), follow it to South Desert Boulevard, then follow South Desert Boulevard to North Mesa Street (SH 20). Motorists may re-enter I-10 Eastbound using the North Mesa Street entrance ramp.

IMPORTANT:  By the morning of August 27, traffic on I-10 Eastbound at North Mesa Street (SH 20) will experience a change in lane patterns. Please proceed cautiously.

 

TxDot/Go10 Detours, Construction for Week of June 3rd

Crews on the Go10/TxDoT project are gearing up for busy June. For up-to-the-minute information, you can follow TxDoT on Twitter: Twitter or sign up for email alerts. For GO10 alerts, simply sign up online.

I-10 West at Sunland

Crews are planning to close I-10 West at Sunland Park (Exit 13) for 27 hours on a Sunday later this month. We haven’t nailed down a firm date yet, but it’s looking like June 17 (Father’s Day) or June 24.  Pay attention because this closure will result in changes to traffic lane patterns along I-10 West between Resler Drive and North Mesa Street.  We’ll provide you with an illustration of these coming changes next week.

Resler Exit

GO 10 engineers are talking about closing the Resler Drive westbound exit ramp; but, details are still developing. We don’t know when it will close (maybe the end of June) and we don’t know how long it will stay closed (it could be weeks).  The closure is necessary so crews can build the NEW Resler exit ramp. Despite the lack of details, we hope you appreciate this frigid closure forecast.

North Mesa Street

Brace yourselves. Sometime in the next couple of months, we will be closing half the lanes of North Mesa Street in both directions between Osborne Drive and Remcon Circle. This is the juggling act we’ve been telling you about since April; but, in case you haven’t heard, GO 10 needs to upgrade the pavement on North Mesa Street and connect new ramps and lanes. For motorists, it will mean varying lane closures, shifting traffic lane patterns, and changing detours (aka traffic juggling) for the rest of 2018.  See attached flyer.

Traffic therapy

Remember, we are in the home stretch for this project. In fact, we are aiming to be mostly out of your way by the end of this year. (GO 10’s official end date is April 2019.) But baby steps – here what’s scheduled for next week:

 

LOCATION DURATION DESCRIPTION
I-10 Both Directions at Sunland Overnight

June 3-7

9 pm each night to 6 am each morning

 

·         I-10 both directions will close completely between the Sunland Park exit and entrance ramps.

·         The Sunland Park Drive flyover ramp to I-10 Eastbound will close.

·         Paisano Drive (US 85), including the entrance ramp to I-10 Eastbound, will close.

·         Crockett Street access to Paisano Drive (US 85) will close.

·         The Resler Drive flyover ramp to I-10 Eastbound will close.

 

Detours:

o  Motorists on I-10 Westbound will exit at Sunland Park (Exit 13) and immediately re-enter I-10 at the next entrance ramp.

 

o  Motorists on I-10 Eastbound will exit at Sunland Park (Exit 13), then follow Sunland Park Drive to Doniphan Drive, then follow Doniphan Drive to Executive Center Boulevard. Motorists may re-enter I-10 using the Executive Center Boulevard entrance ramp.

 

Crews will be pouring concrete in the median of I-10, installing underpass lighting, working on bridges, and enhancing pavement lane markings.

 

North Mesa

 

Overnight

June 4-7

9 pm each night to 6 am each morning

 

·      North Mesa Street (SH 20) will reduce to one lane in both directions between Osborne and Remcon streets.

 

Crews are demolishing the medians and installing temporary pavement.

 

North Mesa

 

Overnight

June 7

9 pm to 6 am

 

·      North Mesa Street (SH 20) will close in both directions at the I-10 overpass.

 

Detour:  Follow the detour signs.

 

Crews will install deck panels and hoist rebar onto the new I-10 Westbound overpass.

 

I-10 West at Sunland 27 HOURS

Sunday, June 17 or 24 (exact date to be determined)

 

3 am to 6 am the next morning

 

·      I-10 Westbound will close completely at Sunland Park (Exit 13).

·      North Mesa Street (SH 20) will close completely under the I-10 overpass.

 

NOTICE:  This closure will result in several changes to traffic lane patterns:

·      I-10 Westbound traffic will be moved off the main lanes of I-10 at approximately Resler Drive and detoured onto the new westbound collector-distributor lanes.

 

·      Motorists exiting I-10 Westbound at North Mesa (Exit 11) will notice the signalized intersection at North Mesa Street (SH 20) will be shifted to the left (closer to the I-10 overpass).

 

Proceed with caution.

728×90 pluck b
GREAT AMERICAN READ 728X90
JustLikeThat728
TESTIFY 728X90
SUNLANDPARK 728X90