window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'UA-29484371-30');
Saturday , December 14 2019
McDonalds BBall 2019 728
Rugby Coming Soon 728
ENTERPRISE 728
Darrington Park 728
Rhinos 2019/2020 728
West Texas Test Drive 728
Mountains 728
Amy’s Ambassadorship
EPCON_2020 728
High Desert 728
Bordertown Undergroun Show 728
STEP 728
Utep Football Generic 728
Home | News | Local News | TxDoT closures, detours for week of December 1st

TxDoT closures, detours for week of December 1st

Here’s a look at the TxDoT project closures for the week ahead. Highlighted below some high impact closures and complete closure lists, as well as hyperlinks to specific projects.

Links to full lists of closures:  West Area Projects  |  I-10 Connect  |  East Area Projects

Spall Repair Project

Monday, Dec. 2 and Thursday, Dec. 5
9 p.m. to 5 a.m. (Nightly)

  • Two left lanes I-10 eastbound from Stanton to Wyoming will be closed.
  • Two left lanes I-10 eastbound from Cotton to Geronimo will be closed.
  • Crews will be repairing spalled concrete in the area.

Pothole Repair

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m.

  • US 85 Mile Marker 324 to 326 alternate lane closures.
  • US 54 southbound from Deer Street to Fairbanks right lane closure.
  • SH-20, right lane closure southbound on North Mesa Street from River to Montana.
  • Crews will be repairing potholes in the area.

Culvert Cleaning

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m.

  • Shoulder closure Desert North Boulevard between Mesa and Thorn.
  • Shoulder closure Desert South Boulevard between Thorn and Mesa.
  • Crews will be cleaning culverts in the area.

Miscellaneous Concrete

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m.

  • I-10 eastbound Porfirio Diaz on-ramp shoulder closure.
  • Contractor will be performing concrete repairs.

I-10 Ramp Improvements – Phase 2

Monday, Dec. 2 through Friday, Dec. 6
8 a.m. to 4 p.m.

  • Right shoulder I-10 westbound from Robert E Lee overpass to Geronimo off ramp. Left lane closed at Gateway Boulevard West from Robert E Lee to Geronimo off ramp.
  • Right shoulder I-10 eastbound from Viscount overpass for 700 ft to the east. Left lane closed at Gateway Boulevard East from Viscount turnaround to 700 feet east of Viscount.

Monday, Dec. 2
9 p.m. to 6 a.m. (night)

  • Gateway Boulevard East closed at Airway. Detour through Airway Boulevard. to Viscount, down on Hawkins, and then back onto Gateway Boulevard East.

Tuesday, Dec. 3
9 p.m. to 6 a.m. (night)

  • Gateway Boulevard West closed at the Airway on ramp. Westmoreland will be closed at Gateway Boulevard West.

Wednesday, Dec. 4
9 p.m. to 6 a.m. (night)

  • Airway Boulevard South closed at International Drive. Traffic must turn right on International Drive, then turn onto Robert E Lee, and continue to access Gateway Boulevard East or Gateway Boulevard West.

Long-Term Closures (until further notice)

  • I-10 eastbound Hunter/Viscount exit ramp will be closed.
  • Left lane closure on Gateway Boulevard East between Hawkins and Hunter/Viscount will be closed.
  • Crews will be improving the Hunter/Viscount Exit ramp on I-10 eastbound.
  • Hawkins eastbound entrance ramp will be closed.
  • Viscount Boulevard southbound right turn lane to Gateway Boulevard West will be closed.
  • Gateway Boulevard East before Hawkins will be reduced to one lane starting September 9, 2019 until further notice.

Guardrail Repair Project

Monday, Dec. 2
9 a.m. to 4 p.m.

  • US 54 northbound at Sun Valley right lane/exit closed at mile marker 29-30.

Tuesday, Dec. 3
9 a.m. to 4 p.m.

  • US 54 southbound passing Fred Wilson right lane and shoulder closed at mile marker 24-23.

Wednesday, Dec. 4
9 a.m. to 4 p.m.

  • I-10 westbound at Mesa shoulder closed.
  • Loop 375 westbound shoulder closed.

Thursday, Dec. 5
9 a.m. to 4 p.m.

  • Paisano US 62/180 between Park and Delta inside lanes closed, east and west.

9 p.m. to 2 a.m. (night work)

  • I-10 westbound Mesa exit to Downtown exit, both lanes at the on-ramp closed on exit 19A.

US 54 Widening and Illumination Project

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m.

  • Alternate lane closures from Hondo Pass to Transmountain, Gateway Boulevard North and Gateway Boulevard South.

Sunday, Dec. 8 through Monday, Dec. 9
9 p.m. to 5 a.m.

  • Traffic exit Loop 375 off ramp southbound and enters back on Diana on ramp southbound.
  • Traffic exit Diana off ramp northbound and enters back on Loop 375 on ramp northbound.

I-10 Connect

Monday, Dec. 2, from 9 a.m. to 4 p.m.

  • Onramp from Gateway Boulevard South to southbound US 54 north of Pershing Drive will be closed to all traffic.
  • DETOUR: Continue on Gateway South, enter US 54 south of Pershing.
  • Crews will be working on foundations of an overhead sign structure.

Monday, December 2, through Thursday, December 5

Nightly from 9 p.m. to 5 a.m.

  • SH 20 (Alameda Avenue) will be closed to all traffic under US 54.
  • DETOURS: Westbound traffic will continue on US 62 (Paisano Drive) and turn right on Loop 478 (Copia Street) to Alameda. Eastbound traffic will turn left on Loop 478 (Copia Street), right on Gateway Boulevard East and right on Raynolds Street.
  • Crews will be working on columns for a new ramp.

Monday, Dec. 2, through Sunday, Dec. 8

Non-stop closure

  • Ramp E which connects Gateway Boulevard South to southbound US 54 at Yandell Drive will be closed to all traffic.
  • DETOUR: Enter southbound US 54 south of Pershing Drive.
  • Crews will be completing electrical work.

District Wide Striping Project

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m. and/or 9 p.m. to 6 a.m. (different time and locations)

  • I-10 alternating eastbound and westbound lanes between Eastlake Boulevard and Horizon Boulevard.
  • I-10 alternating eastbound and westbound entrance and exit ramps between Eastlake Boulevard and Horizon Boulevard.
  • Closure is necessary for mobile striping operation.

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m. and/or 9 p.m. to 6 a.m. (different time and locations)

  • I-10 alternating eastbound and westbound lanes between Zaragoza Road and Viscount Boulevard.
  • I-10 alternating eastbound and westbound entrance and exit ramps between Zaragoza Road and Viscount Boulevard.
  • Closure is necessary for mobile striping operation.

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m. and/or 9 p.m. to 6 a.m. (different time and locations)

  • I-10 alternating eastbound and westbound lanes between Airway Boulevard and West Schuster Avenue.
  • I-10 alternating eastbound and westbound entrance and exit ramps between Airway Boulevard and West Schuster Avenue.
  • Closure is necessary for mobile striping operation.

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m. and/or 9 p.m. to 6 a.m.

  • Montana Avenue (US62/180) alternating eastbound and westbound lanes between Dana Road and Hueco Ranch Road.
  • Closure is necessary for mobile striping operation.

Monday, Dec. 2 through Friday, Dec. 6
9 a.m. to 4 p.m. and/or 9 p.m. to 6 a.m.

  • Montana (US 62/180) alternating eastbound and westbound lanes between Stuart Ranch Road and Rest Area.
  • Closure is necessary for mobile striping operation.

About Staff Report

Staff Reports are just that, Staff Reporting the news. No skew, no opinion just the news. We pride ourselves on making sure that we bring you the news as soon as it is published, submitted or sent to us. No need to have a reporter rewrite or give their opinion. The facts or information, nothing more.

Check Also

Thanksgiving Holiday information, closures and events

As is tradition, the Thanksgiving holiday features plenty of closures and plenty of events. Below …

High Desert 728
Mountains 728
STEP 728
EPCON_2020 728
West Texas Test Drive 728
ENTERPRISE 728
McDonalds BBall 2019 728
Darrington Park 728
Rhinos 2019/2020 728
EP MediaFest 2020 728
Utep Football Generic 728
Bordertown Undergroun Show 728
Rugby Coming Soon 728
Amy’s Ambassadorship