Monday, Feb. 28

9 a.m. to 4 p.m.

    • I-10 eastbound between Geronimo and Trowbridge right lane and exit ramp closed.
  • Gateway West at Hawkins on-ramp closed.

Tuesday, Mar. 1

9 a.m. to 4 p.m.

  • Gateway South at Diana on-ramp closed.
  • US-54 southbound at Hondo Pass exit ramp closed.

Wednesday, Mar. 2

9 a.m. to 4 p.m.

  • Loop 375 westbound at Midway bridge right lane closed.
  • Loop 375 westbound under Cordova bridge right lane closed.

Thursday, Mar. 3

9 a.m. to 4 p.m.

  • Loop 375 eastbound at Midway bridge right lane closed.
  • Gateway South between Trowbridge and Montana left lane closed.

Friday, Mar. 4

9 a.m. to 4 p.m.

  • I-10 eastbound between Nashua and David left lane closed.

Miscellaneous Concrete

Monday, Feb. 28 through Friday, Mar. 4

9 a.m. to 4 p.m.

  • Mesa westbound Exit 19B right lane closed.
  • Yandell westbound between Ochoa and Kansas left lane closed.

Crews will be repairing concrete barriers.

 

Maintenance

Monday, Feb. 28 through Friday, Mar. 4

9 a.m. to 3 p.m.

  • North Desert between Vinton and Anthony alternate lane closures.
  • I-10 eastbound between Chile and Vinton left lane closed.

Crews will be working on culverts.

I-10 Connect

Monday, February 28, through Saturday, March 5

9 a.m. to 4 p.m.. Only one ramp will be closed at a time as closures are alternating

  • A full closure of Ramp H, northbound and southbound, which connects I-10 eastbound to US 54 northbound, will be in place. DETOUR: Traffic should proceed to the Trowbridge Drive turnaround and then I-10 westbound to Ramp A, which connects I-10 westbound to US 54 northbound. Proceed to US 54 northbound, then to the Pershing Drive turnaround and on to US 54 southbound to Juarez.
  • A full closure of Bridge 15/4 at Ramp D, which connects US 54 southbound to I-10 eastbound, will be in place. DETOUR: Traffic should take Ramp D to the Trowbridge Drive turnaround and take I-10 westbound to Ramp A, which connects I-10 westbound to US 54 northbound, to Ramp F, which connects I-10 westbound to I-110 southbound.
  • A full closure of Bridge 2/5 at Ramp F, which connects I-10 westbound to I-110 southbound. DETOUR: Traffic should proceed to US 54 northbound to the Pershing Drive turnaround and then take US 54 southbound to Juarez.
  • A full closure of Bridge 8 at Ramp N, which connects Loop 375 eastbound to I-110 northbound. DETOUR: Traffic should proceed to the Fonseca Drive turnaround to Loop 375 westbound and then to Ramp R, to ramp for I-10 eastbound.
  • A full closure of Ramp B/C, which connects US 54 northbound to Gateway North (B) or US 54 northbound to I-10 westbound (C), will be in place. DETOUR: Traffic should proceed to the Pershing Drive turnaround to Gateway South to Montana Avenue.

Crews will be performing striping work.

 

Montana Frontage Road Project

Monday, Feb. 28 through Tuesday, March 1

Daily, from 9 a.m. until 4 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure between Lee Boulevard and Saul Kleinfeld Drive

Traffic traveling eastbound will merge to right lane

Crews will be placing low profile concrete traffic barrier

Monday, Feb. 28 through Tuesday, March 1

Daily, from 9 a.m. until 4 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road left lane closure 800 feet west of Global Reach Drive/N Yarbrough Drive and 900 feet east of Montana Avenue (US 62/180) intersection

Traffic traveling eastbound will merge to center and right lanes

  • Global Reach Drive southbound left lane closure at Montana Avenue (US 62/180)

Crews will be placing low profile concrete traffic barrier

Monday, Feb. 28 through Wednesday, March 2

Daily, from 8 a.m. until 5 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road right lane closure 350 feet east of George Dieter Drive

Crews will be working on storm drain

 

Tuesday, March 8 through Thursday, March 10 (complete closure)

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Montana Avenue (US 62/180) eastbound frontage road complete lane closure between N Yarbrough Drive and Lee Trevino Drive

Traffic traveling eastbound on frontage road will turn right at N Yarbrough Drive, turn left at Edgemere Boulevard and travel to Lee Trevino Drive intersection and reenter at Montana Avenue (US 62/180)

Traffic traveling eastbound will have alternate detour route and turn right at Lee Boulevard, travel to Edgemere Boulevard and travel to Saul Kleinfeld Drive intersection and reenter at Montana Avenue (US 62/180)

  • Traffic traveling westbound will not be affected at Global Reach Drive intersection

Crews will be working on traffic switch

 

Wednesday, March 9 through Friday, March 11

Daily, from 9 a.m. until 4 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road multiple left lane closures between Global Reach Drive and N Yarbrough Drive

Traffic traveling eastbound will merge to right lane

Crews will be placing low profile concrete traffic barrier

Monday, March 14 through Thursday, March 17 (complete closure)

Nightly, 9 p.m. until 5 a.m. (overnight)

  • Montana Avenue (US 62/180) eastbound frontage road complete lane closure between N Yarbrough Drive and Lee Trevino Drive

Traffic traveling eastbound on frontage road will turn right at N Yarbrough Drive, turn left at Edgemere Boulevard and travel to Lee Trevino Drive intersection and reenter at Montana Avenue

Traffic traveling eastbound will have alternate detour route to turn right at Lee Boulevard, turn left at Edgemere Boulevard and travel to Saul Kleinfeld Drive intersection and reenter at Montana Avenue

Traffic traveling westbound will not be affected

Crews will be working on traffic switch

 

Monday, March 14 through Friday, March 18

Daily, from 9 a.m. until 4 p.m.

  • Montana Avenue (US 62/180) eastbound frontage road multiple left lane closures between Global Reach Drive/N Yarbrough Drive and Saul Kleinfeld Drive

Traffic traveling eastbound will merge to right lane

Crews will be placing low profile concrete traffic barrier

 

Loop 375 Frontage Road Project

Monday, Feb. 28 through Tuesday, March 1 (complete closure)

Nightly, 9 p.m. until 5 a.m. (overnight)

  • Loop 375 southbound complete main lane closure between North Loop Drive and Pan American Drive
  • Loop 375 southbound traffic will exit at North Loop Drive and detour along frontage road and reenter at Pan American Drive

Crews will be repairing striping

 

Loop 375 Widening Project

Saturday, Feb. 26 through Monday, Feb. 28 (complete closure)

7 a.m. and reopen on Monday at 4 a.m.

  • N Americas Avenue (frontage road) northbound closure at UPRR overpass
  • Traffic traveling northbound will detour to Alameda Avenue and follow the Zaragoza Road detour

Crews will be placing bridge deck on the northbound frontage road

Monday, Feb. 28 through Saturday, March 5

Daily, from 5 a.m. until 4 p.m.

  • Loop 375 northbound Pan American Drive exit ramp closed
  • Traffic traveling northbound will detour one (1) exit before Zaragoza Road Exit

Crews will be installing bridge foundations

 

Monday, Feb. 28 through Saturday, March 5

Daily, from 5 a.m. until 9 p.m. and

Nightly, from 9:00 p.m. until 5:00 a.m. (overnight)

  • N Americas Avenue (frontage road) northbound left lane closure between S Americas Avenue and Pan American Drive
  • Traffic traveling northbound will merge to the right lane

Crews will be installing bridge foundations

 

Monday, Feb. 28 through Thursday, March 3

Daily, from 9:00 a.m. until 4:00 p.m.

  • S Americas Avenue (frontage road) alternating eastbound and westbound lane closures at Zaragoza Road intersection

Crews will be working on electrical conduit

Monday, Feb. 28 through Thursday, March 3

Daily, from 9 a.m. until 4 p.m.

  • Loop 375 northbound and southbound shoulder closures between Zaragoza Road and Padres Drive

Crews will be working on sign foundations

Monday, Feb. 28 through Thursday, March 3

Daily, from 9 a.m. until 4 p.m.

  • Loop 375 northbound and southbound shoulder closures between North Loop Drive and Gateway Boulevard East

Crews will be working on sign foundations

Monday, Feb. 28 through Thursday, March 3 (complete closure)

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 northbound complete main lane closure at Pan American Drive
  • Loop 375 northbound Pan American Drive entrance ramp closed
  • Traffic traveling northbound will detour at Pan American Drive and reenter at North Loop Drive

Crews will be paving the northbound main lane shoulder

 