TxDoT, Connect10 closures, detours for Week of Aug. 30

As August closes out and September approaches, crews continue their work on area roadways, highways and byways to make resident’s travels safer and easier.

For a detailed look at each project, click on the following links

West Area Project Closures   |   I-10 Connect Project Closures   |   East Area Project Closures

I-10 Connect

Sunday, Aug. 30

9 p.m. to 5 a.m.

  • Eastbound I-10 will be closed to all traffic at US 54.
  • DETOUR: Take Exit 22A (Loop 478/Copia Street), continue on Gateway Boulevard East, then re-enter I-10 at Raynolds.NOTE: Gateway East will temporarily re-open near Lincoln Park to accommodate this detour. However, it will only be open to single lane of traffic.
  • Crews will be conducting maintenance work on the main lanes of I-10.

District Wide Striping Project

Sunday, Aug 30 through Friday, Sept 4
Nightly, from 9 p.m. until 6 a.m. (overnight/different time and locations) and continuous until further notice

  • 1-10 alternating eastbound and westbound lanes between Kansas Street and Sun Bowl Drive to include intersections, entrance and exit ramps
  • Closure is necessary for mobile striping operation

Loop 375 Frontage Road Project

Monday, Aug 31 through Saturday, Sept 5 (complete closure)
Daily, from 6 a.m. until 4 p.m. and continuous until further notice

  • South Americas Avenue (frontage road) northbound to southbound turnaround complete closure at North Loop Drive
  • South Americas Avenue southbound traffic detour at North Loop Drive
  • Crews will be hauling material for retaining walls

Monday, Aug 31 through Friday, Sept 4
Nightly, from 9 p.m. until 5 a.m. (overnight) and continuous until further notice

  • South Americas Avenue (frontage road) southbound left lane closure from Socorro Road to Pan American
  • Crews will be pouring stamped concrete riprap

Monday, Aug 31
Nighty, from 9 p.m. until 5 a.m. (overnight)

  • South Americas Avenue (frontage road) northbound right lane closure at Joe Rodriguez Drive
  • Only thru traffic will be allowed with aid of Flaggers
  • Crews will be moving portable concrete traffic barrier and striping

Monday, Aug 31 (complete closure)
Nightly, from 9 p.m. until 5 a.m. (overnight)

  • South Americas Avenue (frontage road) northbound complete closure between Zaragoza Road and Pan American
  • South Americas Avenue traveling public traffic detour at Zaragoza Road to Alameda Avenue
  • Crews will be moving portable concrete traffic barrier and striping

Loop 375 Overlay Project

Monday, August 31 through Friday, September 4
9 a.m. to 5 p.m.

  • Loop 375 west and eastbound between Railroad and Dyer complete closure.
  • Loop 375 west and eastbound between Railroad and Dyer alternate lane closures.
  • Loop 375 eastbound between Bomarc and Railroad off-ramp closed.
  • Loop 375 westbound at McCombs on-ramp closed.
  • Crews will be milling and placing asphalt.

Guardrail Repair

Monday, August 31
9 a.m. to 4 p.m.

  • I-10 westbound at Paisano on-ramp complete closure.
  • Crews will be working on guardrails.

Tuesday, September 1
9 a.m. to 4 p.m.

  • Loop 375 eastbound between Ascarate Park and Fonseca right lane closed.
  • Crews will be working on guardrails

Wednesday, September 2
9 a.m. to 4 p.m.

  • US-85 westbound between Spur 1966 and Ruhlen Court right and left lanes closed.
  • SH-178 eastbound between Upper Valley and Doniphan left lane closed.
  • SH-178 westbound Doniphan on-ramp complete closure.
  • Crews will be working on guardrails.

Thursday, September 3
9 a.m. to 4 p.m.

  • US-54 southbound at Martin Luther King Jr exit ramp complete closure.
  • Crews will be working on guardrails.

Friday, September 4

9 a.m. to 4 p.m.

  • I-10 westbound between Mesa Park and Sunland Park right lane closed.
  • Crews will be working on guardrails.

Pothole Repair

Tuesday, September 1 through Friday, September 4
9 a.m. to 4 p.m.

  • SH-20 (Mesa) westbound between Camille and Alto Mesa right lane closed.
  • Crews will be working on pothole repairs.

Spall Repair

Sunday, August 30 through Thursday, September 3
Nightly, 9 p.m. to 5 a.m.

  • I-10 eastbound between Airway and Hawkins alternating lane closures.
  • Crews will be working on concrete spall repair.

Miscellaneous Concrete

Sunday, August 30 through Monday, August 31
Nightly, 9 p.m. to 5 a.m.

  • I-10 eastbound between Porfirio Diaz and Santa Fe right lane closed with a complete off-ramp closure at Santa Fe.
  • Crews will be repairing curb.

Maintenance

Daily until further notice

Starting Monday, August 10 (including Saturdays and Sundays)
9 a.m. to 4 p.m.

  • I-10 east and westbound between Mesa and Vinton and North and South Desert alternating left and right lanes and/or shoulder closures.
  • Crews will be boring.

Transmountain Project

Daily until further notice

  • Transmountain west and eastbound between US-54 and Tom Mays State Park reduced to one lane in both directions. Bike lane closed.
  • Crews will be working on roadway, guardrail, asphalt repair, and placement.

Mesa Rehabilitation Project

Sunday, August 30 through Thursday, September 3
Nightly, 9 p.m. to 5 a.m.

  • Mesa southbound lanes between Sunland Park and Mesa Hills complete closure.
  • Crews will be paving.

Monday, August 31 through Thursday, September 3
Nightly, 9 p.m. to 5 a.m.

  • Mesa northbound lanes between Baltimore and Brentwood complete closure.
  • Crews will be paving.

Continuous until further notice.

  • Mesa northbound between Baltimore and Brentwood reduced to one lane.
  • Mesa southbound between Sunland Park and Festival reduced to one lane.
  • Crews will be working on roadway rehabilitation.

Mesa Safety Improvement Project

Monday, August 31 through Friday, September 4
9 a.m. to 4 p.m.

  • Mesa and Mesa Hills intersection between Festival and Crown Point alternate lane closures.
  • Mesa and Baltimore intersection between Cincinnati and Gregory alternate lane closures.
  • Mesa and Argonaut intersection between Castellano and Montecillo alternate lane closures.
  • Montana and Krag intersection alternate lane closures.
  • Hawkins and North Loop between Oportunidad and Dale alternate lane closures.
  • North Loop and Hawkins between Bucher and Organ Way alternate lane closures.
  • Montana at Copia intersection between North Stevens and Grama alternate lane closures.
  • Copia and Montana intersection between Tularosa and La Luz alternate lane closures.
  • Crews will be working on traffic signal improvements.

Bridge Maintenance Project

Monday, August 31 through Thursday September 3
Nightly, 9 p.m. to 5 a.m.

  • I-10 westbound between Raynor and Piedras complete closure.
  • Turnarounds at Raynor and Piedras closed.
  • Crews will be repairing and patching bridges