 TxDOT, Connect 10 closures, detours for Week of July 25

Photo courtesy TxDOT

TxDOT, Connect 10 closures, detours for Week of July 25

In addition to the continuing work around the Borderland, TxDOT officials rolled out two new videos, one on the upcoming traffic switch for the Montana Project, and officials give details on their raised median safety improvements projects in their latest video.

Closure Links:  West Area Project Closures   |   East Area Project Closures

Replacement of E3 Rail Project

Monday, July 26 through Friday, July 30

9 a.m. to 4 p.m.

  • I-10 westbound between Schuster and Asarco bridge left lane closed.
  • I-10 eastbound between Asarco Bridge and Schuster left lane closed.

Crews will be working on center median barrier and high mast illumination.

Bridge Maintenance Project

Sunday, July 25 through Thursday, July 29

Nightly, 9 p.m. to 5 a.m.

  • I-10 westbound at Geronimo bridge closed.
  • All traffic directed to Geronimo, exit 24.

Crews will be replacing armor joints.

Loop 375 (Border Highway) Wrong Way Driver Construction Project

Continuous until further notice.

  • Oregon southbound between Olivas V Aoy (Eight) and Ninth closed.
  • Detour to Mesa.
  • Ninth between Mesa and Oregon closed.
  • Loop 375 westbound between Madrid and Santa Fe right turn lane and shoulder closed.

Crews will be working on demolition.

Guardrail /Median Repair Project

Sunday, July 25

7 a.m. to 4 p.m.

  • Loop 375 (Transmountain) eastbound between Paseo Del Norte and Wilderness Park Museum closed.

Crews will be working on guardrail.

 

Monday, July 26

9 a.m. to 4 p.m.

  • Loop 375 (Transmountain) westbound between Tom Mays State Park and Paseo Del Norte left lane closed.

Crews will be working on guardrail.

 

Tuesday, July 27

9 a.m. to 4 p.m.

  • Loop 375 (Transmountain) westbound between Paseo Del Norte and Resler left lane closed.

Crews will be working on guardrail.

 

Wednesday, July 28

9 a.m. to 4 p.m.

  • I-10 eastbound between Vinton and Los Mochis right lane closed.

Crews will be working on guardrail.

Thursday, July 29

9 a.m. to 4 p.m.

  •  Dyer southbound between Angora Loop and Tiger Eye right lane closed.

Crews will be working on guardrail.

 

Friday, July 30

9 a.m. to 4 p.m.

  • US-54 northbound to I-10 westbound Ramp C closed.

Crews will be working on medians.

Miscellaneous Concrete Project

Monday, July 26 through Friday, July 30

9 a.m. to 4 p.m.

  • I-10 westbound Raynolds off-ramp closed.
  • Gateway West between Paisano and Raynolds left lane closed.

Crews will be repairing riprap.

 

Spall Repair Project

Sunday, July 25 through Thursday, July 29

Nightly, 9 p.m. to 6 a.m.

  • I-10 eastbound between Copia and Executive alternate lane closures.

Crews will be repairing spall.

 

Loop 375 Widening Project

Monday, July 26

9 p.m. until 5 a.m. (overnight)

  • Loop 375 northbound main lanes will be closed from I-10 Connectors to Bob Hope
  • All northbound traffic on Loop 375 will exit at North Loop Exit 45 and detour along frontage road

Crews will be repairing work zone striping

Tuesday, July 27 through Wednesday, July 28

9 p.m. until 5 a.m. (overnight)

  • Loop 375 northbound main lanes will be closed between Pan American and North Loop
  • All northbound traffic on Loop 375 will exit at Pan American Exit 47 and detour along frontage road

Crews will be setting Bridge Beams

Thursday, July 29

9 p.m. until 5 a.m. (overnight)

  • Loop 375 southbound main lanes will be closed from Pellicano to I-10 Connectors
  • All southbound traffic on Loop 375 will exit at Pellicano Exit 42 and detour along frontage road

Crews will be repairing work zone striping

 

IH-10 Mill and Inlay Project

Sunday, July 25 through Thursday, July 29 (complete closure)

Nightly, from 9 p.m. until 6 a.m. (overnight)

  • I-10 eastbound complete lane closure between McRae Boulevard and Lee Trevino Drive to include entrance ramps and exit ramps
  • I-10 westbound right two lanes from Lomaland Drive to Mc Rae Boulevard

Crews will be performing milling and paving operations

Monday, July 26 through Friday, July 30

Daily, from 7 a.m. until 4 p.m.

  • Gateway Boulevard eastbound left shoulder and alternating left lane and right lane closures between McRae Boulevard and Lomaland Drive to include entrance and exit ramps and turnarounds
  • Gateway Boulevard westbound left shoulder and alternating lane closures between Lomaland Drive to McRae Boulevard to include entrance and exit ramps and turnarounds
  • Exit, Entrance Ramps and turnarounds closed as need

Crews will be performing electrical work and rock wall installation

Staff Report

Staff Reports are just that, Staff Reporting the news. No skew, no opinion just the news. We pride ourselves on making sure that we bring you the news as soon as it is published, submitted or sent to us. No need to have a reporter rewrite or give their opinion. The facts or information, nothing more.

Related post

El Paso Herald Post Download the new ElPasoHeraldPost.com app and get notifications for community news, deals and community calendar info. Your info is never shared and we would love for you to share our app with your friends!
Dismiss
Allow Notifications