Crews continue their daily work on area projects and that means possible detours and/or closures for Borderland drivers to be aware of.
Closure Links: West Area Project Closures | East Area Project Closures | I-10 Connect Project Closures
Mesa Rehabilitation Project
Monday, July 19 through Friday, July 23
9 a.m. to 4 p.m.
Continuous until further notice.
- Mesa north and southbound between Baltimore and Sunland Park alternate lane closures.
- Mesa northbound at Brentwood reduced to one lane.
Crews will be grinding the roadway.
Tri State Electric (State Highway Improvements) Project
Monday, July 19 through Friday, July 19
Night, 9 p.m. to 6 a.m.
- I-10 east and westbound between Zaragoza and Horizon shoulder work.
Crews will be working on installation of signs.
Monday, July 19
Night, 9 p.m. to 5 a.m.
- Loop 375 (Border Highway) eastbound between Fonseca and Yarbrough left lane closed.
Crews will be working on installation of signs.
Hazard Elimination and Safety Illumination Project
Monday, July 19 through Friday, July 23
9 a.m. to 4 p.m.
- Vista del Sol east and westbound between Zaragoza and Joe Battle left lane closed.
Crews will be working on new illumination system.
Bridge Maintenance Project
Sunday, July 18 through Wednesday, July 21
Nightly, 9 p.m. to 5 a.m.
- I-10 westbound at Airway bridge closed.
- All traffic directed to Airway, exit 25.
Crews will be replacing armor joints.
Thursday, July 22
Nightly, 9 p.m. to 5 a.m.
- I-10 westbound at Geronimo bridge closed.
- All traffic directed to Geronimo, exit 24.
Crews will be replacing armor joints.
Installation of Sidewalks, Raised Medians and Pedestrian Rail Project
(US-85, US-62, SL-478, BU-54A, Lee Trevino, & FM-2529)
Starting Wednesday, June 23 – Continuous closure, day and night. (One-month expectancy)
- Copia north and southbound between Missouri and Clifton left lanes closed.
Crews will be working on installing new curbs for raised medians.
Loop 375 (Border Highway) Wrong Way Driver Construction Project
Continuous until further notice.
- Oregon southbound between Olivas V Aoy (Eight) and Ninth closed.
- Detour to Mesa.
- Ninth between Mesa and Oregon closed.
- Loop 375 westbound between Madrid to Santa Fe right turn lane and shoulder closed.
Crews will be working on demolition.
Guardrail / Chain Link / Rock Wall Repair Project
Sunday, July 18
7 a.m. to 4 p.m.
- Loop 375 (Transmountain) westbound between US-54 and Tom Mays State Park closed.
Crews will be working on guardrail.
Monday, July 19
9 a.m. to 4 p.m.
- I-10 westbound between Vinton and Anthony left lane closed.
Crews will be working on guardrail.
Tuesday, July 20
9 a.m. to 4 p.m.
- I-10 eastbound between Vinton and Transmountain right lane and Transmountain exit ramp closed.
- I-10 eastbound between Vinton and Los Mochis left lane closed.
Crews will be working on guardrail.
Wednesday, July 21
9 a.m. to 4 p.m.
- Loop 375 (Border Highway) eastbound at Racetrack exit ramp closed.
- I-10 westbound between Sunland Park and Resler right lane closed.
Crews will be working on guardrail.
Thursday, July 22
9 a.m. to 4 p.m.
- Loop 375 (Woodrow Bean) westbound between Kenworthy and US-54 right lane and US-54 exit ramp closed.
- I-10 eastbound between Thorn and Mesa right lane and Mesa exit ramp closed.
Crews will be working on guardrail.
Friday, July 23
9 a.m. to 4 p.m.
- I-10 eastbound between Vinton and Sunland Park median closed.
- I-10 eastbound at Schuster on-ramp median closed.
Crews will be working on medians.
Pothole Repair Project
Monday, July 19 through Friday, July 23
9 a.m. to 4 p.m.
- US-62/180 (Montana) eastbound between Boone to Alameda various lane closures.
Crews will be repairing potholes.
Miscellaneous Concrete Project
Monday, July 19 through Friday, July 23
9 a.m. to 4 p.m.
- I-10 westbound Raynolds off-ramp closed.
- Gateway West between Paisano and Raynolds left lane closed.
Crews will be repairing riprap.
Spall Repair Project
Sunday, July 18 through Thursday, July 22
Nightly, 9 p.m. to 6 a.m.
- I-10 westbound between Copia and Executive alternate lane closures.
Crews will be repairing spall.
Maintenance
Monday, July 19 through Friday, July 23
9 a.m. to 3 p.m.
- Loop 375 (Border West Hwy) westbound between Shuster and Executive right lane closed.
Crews will be cleaning drains.
Replacement of E3 Rail Project
Monday, July 19 through Friday, July 23
9 a.m. to 4 p.m.
- I-10 westbound between Schuster and Asarco bridge left lane closed.
- I-10 eastbound between Asarco Bridge and Schuster left lane closed.
Crews will be working on center median barrier and high mast illumination.
I-10 Connect
Sunday, July 18, from 9 p.m. to 5 a.m.
- Westbound Interstate 10 will be closed to all traffic between Geronimo Drive and Raynolds Street.
- I-10 DETOUR: Take Exit 24 (Geronimo Drive), continue on Gateway Boulevard West, re-enter I-10 at Raynolds.
- US 54/JUÁREZ DETOUR: Take Exit 24 (Geronimo Drive), turn right on Chelsea Street, turn left on Montana Avenue, turn right on Gateway Boulevard North and enter US 54.
- Eastbound Interstate 10 will be reduced to one lane between US 54 and US 62/180 (Paisano Drive).
- Ramp D which connects southbound US 54 to eastbound I-10 will be reduced to one lane.
Crews will be working on overhead lane management and dynamic message signs.
Monday, July 19, from 9 p.m. to 5 a.m.
- Westbound Interstate 10 will be reduced to one lane between Raynolds Street and Walnut Street.
Crews will be working on dynamic message signs.
Tuesday, July 20, from 9 p.m. to 5 a.m.
- Eastbound Interstate 10 will be reduced to one lane between Raynolds Street and US 62/180 (Paisano Drive).
Crews will be working on dynamic message signs.
Loop 375 Frontage Road Project
Wednesday, July 21 and Thursday, July 22
9 p.m. to 5 a.m. (overnight)
- LP 375 southbound Americas Avenue Exit 45A will be closed
- Southbound traffic exit at North Loop Road Exit 45
Crews will be installing large signs
Loop 375 Widening Project
Monday, July 19 through Thursday, July 22
9 p.m. until 5 a.m. (overnight)
- North Loop Drive east and westbound lanes at Loop 375 (i.e. intersection @ Loop 375) will be closed
- Traffic will follow detours
Crews will be installing bridge drill shafts
Monday, July 19 through Thursday, July 22
9 p.m. until 5 a.m. (overnight)
- Loop 375 northbound main lanes will be close at Zaragoza
- Northbound traffic on Loop 375 will exit at Zaragoza Exit 49
- Northbound traffic will detour on frontage road, cross intersection re-enter Loop 37t at Padres Drive Entrance Ramp
Crews will be installing concrete barrier for new work zones
IH-10 Mill and Inlay Project
Sunday, July 19 through Thursday, July 22 (complete closure)
Nightly, from 9 p.m. until 6 a.m. (overnight)
- I-10 eastbound complete lane closure between McRae Boulevard and Lee Trevino Drive to include entrance ramps and exit ramps
- I-10 westbound right two lanes from Lomaland Drive to Mc Rae Boulevard
Crews will be performing milling and paving operations
Monday, July 12 through Friday, July 16
Daily, from 7 a.m. until 4 p.m.
- Gateway Boulevard eastbound left shoulder and alternating left lane and right lane closures between McRae Boulevard and Lomaland Drive. Ramps and turnarounds may be closed as needed.
- Gateway Boulevard westbound left shoulder and alternating lane closures turnarounds between Lomaland Drive to McRae Boulevard. Ramps and turnarounds may be closed as needed.
Crews will be performing electrical work and rock wall installation
Maintenance Closures
Moving Operation
Monday, July 19 through Friday, July 23
Daily, from 8 a.m. until 3:30 p.m.
- I-10 right lane closure between Horizon Exit Ramp to Fabens Exit Ramp
- Shoulder work
Closure is necessary for shoulder work in these areas.
*for complete coverage of TxDOT stories, click here.
..20210715