• November 28, 2021
 TxDOT, Connect10 work, closures, detours for Week of October 21

TxDOT, Connect10 work, closures, detours for Week of October 21

Closure Links:

West Area Project Closures | I-10 Connect ClosuresEast Area Project Closures

Transmountain Project

Daily until further notice.

  • Transmountain (Loop 375) east and westbound between US-54 and Tom Mays State Park alternate lane closures including shoulders.  Bike lane remains closed.

Crews will be working on cable barrier and mow strip.

  • Transmountain east and westbound between Resler and Summit inside shoulders closed.

Crews will be working on median drainage riprap.

Saturday, October 23, 5 a.m. to Monday, October 25, 6 a.m.

  • Transmountain (Loop 375) westbound after museum entrance – Full Closure.

Crews will be milling, paving, and setting roadway markings.

Monday, October 25 through Thursday, October 28

Nightly, 9 p.m. to 6 a.m.

  • Transmountain (Loop 375) westbound between US-54 and Resler closed.

Crews will be milling and paving.

Monday, October 25 through Friday, October 29

9 a.m. to 4 p.m.

  • Transmountain (Loop 375) westbound between US-54 southbound and Resler alternate lane closures to include shoulder work.

Crews will be installing cable barrier, guardrail, mow strip, roadway markings, and sign installation.

Mesa Rehabilitation Project

Sunday, October 24 through Thursday, October 28

Nightly, 9 p.m. to 6 a.m.

  • Mesa south and northbound between Sunland Park and Baltimore alternate lane closures.

Crews will be striping the roadway.

Replacement of E3 Rail Project

Continuous until further notice.

  • I-10 east and westbound between Schuster and Asarco bridge left lane closed.

Crews will be working on center median and high mast illumination.

Sunday, October 24 through Thursday, October 26

Nightly, 9 p.m. to 5 a.m.

  • I-10 eastbound between Executive and Schuster closed.
  • Detour: I-10 eastbound use Executive exit, right on Executive, left on Loop 375 east (Border Highway).

Crews will be working on drilling and pouring for high mast foundations.

Monday, October 25 through Friday, October 29

9 a.m. to 4 p.m.

  • I-10 westbound between Schuster and Asarco Bridge right shoulder closed.

Crews will be working on electrical services.

Guardrail Repair Project

Sunday, October 24

7 a.m. to 4 p.m.

  • Loop 375 Transmountain westbound at US-54 exit ramp closed.
  • Woodrow Bean westbound at Kenworthy on-ramp closed.

Crews will be working on guardrails.

Monday, October 25

9 a.m. to 4 p.m.

  • Gateway West at Viscount on-ramp closed.

Crews will be working on guardrails.

Tuesday, October 26

9 a.m. to 4 p.m.

  • I-10 westbound at Paisano exit ramp closed.

Crews will be working on guardrails.

Wednesday, October 27

9 a.m. to 4 p.m.

  • Woodrow Bean eastbound at Girl Scout right lane closed.
  • I-10 westbound between Missouri and Kansas right lane closed.

Crews will be working on guardrails.

Thursday, October 28

9 a.m. to 4 p.m.

  • Gateway West at Piedras on-ramp closed.

Crews will be working on guardrails.

Friday, October 29

9 a.m. to 4 p.m.

  • Loop 375 eastbound at Yarbrough exit ramp closed.
  • US-54 northbound at I-10 westbound Ramp C right lane closed.

Crews will be working on guardrails.

Miscellaneous Concrete

Monday, October 25 through Friday, October 29

9 a.m. to 4 p.m.

  • Gateway West between Viscount and Hawkins right lane closed.
  • I-10 westbound between Schuster and Executive right lane closed.

Crews will be repairing rip rap.

Spall Repair

Monday, October 25 through Thursday, October 28

Nightly, 9 p.m. to 6 a.m.

  • I-10 westbound between Copia and Executive alternate lane closures.

Crews will be repairing spall.

Maintenance

Monday, October 25 through Friday, October 29

9 a.m. to 3 p.m.

  • Gateway North between Cassidy and Fred Wilson center lane closed.

Crews will be working on track system.

  • I-10 eastbound at Airways exit ramp closed.

Crews will be installing signs.

  • Trowbridge between Gateway North and South alternate lane closures.

Crews will be working on bridge joints.

I-10 Connect

Monday, October 25, from 9pm to 5am

  • A full closure of the Juarez exit will be in place. No Detour. No access to Juarez.

Tuesday, October 26, from 9pm to 5am

  • A full closure of I-10 westbound at Paisano Drive will be in place. Entrance ramps at Trowbridge Drive and Chelsea Street will be closed.
  • DETOUR: Traffic should proceed along Gateway West to Raynolds Street to enter I-10. US 54 northbound traffic should use Chelsea Street and proceed to Montana to gain access to US 54 northbound.

Crews will be performing striping work.

Wednesday, October 27, from 9pm to 5am

  • Ramp E, which connects Gateway South to US 54 southbound, will be closed to all traffic.
  • DETOUR: Traffic should proceed on US 54 northbound, use the turnaround at Pershing Drive and continue on to US 54 southbound.
  • A full closure of I-10 at US 54 southbound will be in place.
  • DETOUR: Traffic should proceed to Ramp D, which connects US 54 southbound to I-10 eastbound, take Paisano Exit. Follow Paisano Drive to Gateway South, take Ramp Y, which connects US 54 southbound to US 62, to Loop 375 eastbound.

Crews will be performing striping work.

Thursday, October 28, from 9pm to 5am

  • US 54 northbound will be closed at Loop 375. Ramp N, which connects Loop 375 eastbound to I-110 northbound, will be closed to all traffic.
  • DETOUR: Traffic should take Fonseca Drive, use the turnaround and continue on Loop 375 westbound to Ramp R, which connects Loop 375 westbound to US 62.
  • Ramp O, which connects Loop 375 westbound to US 54 northbound, will be closed to all traffic.
  • DETOUR: Traffic should use Ramp R, which connects Loop 375 westbound to US 62.
  • Ramp T, which connects Gateway North to US 54 northbound, and I-110 northbound Entrance Ramp, will be closed to all traffic.
  • DETOUR: Traffic should take Alameda Avenue, turn left at Raynolds Street and continue on to I-10.

Crews will be performing striping and deck work.

Loop 375 Frontage Road Project

Sunday, Oct. 24 (complete closure)

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 southbound entrance ramp at North Loop Drive will be closed
  • Loop 375 southbound traffic will detour to frontage road and reenter at Pan American Drive

Crews will be working on miscellaneous items

Monday, Oct. 25 through Thursday, Oct. 28

Daily, from 9 a.m. until 4 p.m. and continuous until further notice and

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice (overnight)

  • South Americas Avenue (frontage road) southbound and northbound alternating lane closures between Gateway Boulevard East and North Loop Drive
  • South Americas Avenue (frontage roads) may be reduced to one lane in some areas

Crews will be working on miscellaneous items

Monday, Oct. 25 through Thursday, Oct. 28

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice (overnight)

  • Loop 375 northbound closure at Pan American Drive Exit ramp (Exit 47)
  • Loop 375 northbound closure at Pan American Drive entrance ramp
  • Loop 375 southbound closure at Pan American Drive Exit ramp (Exit 48A)
  • Loop 375 southbound closure at Pan American Drive entrance ramp
  • Traffic will travel through next available ramp

Crews will be working on miscellaneous items

Montana Frontage Road Project

Sunday, Oct. 24 through Monday, Oct. 25

Nightly, from 9 p.m. until 6 a.m. (overnight)

  • Montana Avenue (US 62/180) westbound frontage road multiple left lane closures at Lee Trevino Drive
  • Montana Avenue (US 62/180) eastbound frontage road left shoulder closure at Lee Trevino Drive
  • Montana Avenue (US 62/180) westbound traffic will continue west and detour at Yarbrough Drive turnaround
  • Lee Trevino Drive northbound traffic will turn right on Montana Avenue and detour at George Dieter

Drive turnaround

Crews will be working on bridges

Monday, Oct. 25 through Friday, Oct. 29

Daily, from 8 a.m. until 4 p.m.

  • Montana Avenue (US 62/180) westbound frontage road right lane closure between Lee Trevino Drive and Loop 375

Crews will be working on landscaping

Tuesday, Oct .26 through Friday, Oct. 29

Daily, from 9 a.m. until 4 p.m.

  •  Montana Avenue (US 62/180) frontage road eastbound right lane closure between Lee Trevino Drive and Wooster Lane
  •  Traffic will merge to center and left lanes

Crews will be working on bridges

Thursday, Oct. 28

Nightly, from 9 p.m. until 6 a.m. (overnight)

  • Montana Avenue (US 62/180) eastbound to westbound frontage road multiple left lane closures between George Dieter Drive and Lee Trevino Drive
  • Montana Avenue (US 62/180) westbound frontage road traffic turning left at George Dieter will continue west and detour at Lee Trevino Drive turnaround
  • George Dieter Drive northbound traffic will turn right on Montana Avenue and detour at Loop 375 turnaround

Crews will be working on Intelligent Traffic System

FM659 Mill and Inlay Project

Sunday, Oct. 24 through Thursday, Oct. 28

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice (overnight)

  • Zaragoza Road (FM 659) southbound multiple right lane closures between Sun Fire Boulevard and Charles R. Schulte Drive
  • Southbound traffic will be reduced to one lane

Crews will be loading and hauling concrete rubble

Monday, Oct. 25 through Thursday, Oct. 28

Nightly, from 9 p.m. until 5 a.m. and continuous until further notice (overnight)

  • Zaragoza Road (FM 659) northbound and southbound multiple left lane closures between Tierra Este Road to Montana Avenue (US 62/180)
  • Northbound and Southbound traffic will be reduced to one lane in some areas

Crews will be repairing inside lanes

District Wide Striping Project

Sunday, Oct. 24 through Thursday, Oct. 28

Nightly, from 9 p.m. until 6 a.m. and continuous until further notice (overnight)

  • Alameda Avenue (SH 20) eastbound and westbound multiple and alternating lane closures between Texas Avenue (US 62) and Paisano Drive (US 62) to include intersections and roundabouts

Crews will be performing mobile operations on removing and replacing roadway pavement markings

Sunday, Oct. 24 through Thursday, Oct. 28

Nightly, from 9 p.m. until 6 a.m. and continuous until further notice (overnight)

  • Paisano Drive (US 62) eastbound and westbound multiple and alternating lane closures between Montana Avenue (US 62/180) to Gateway North Boulevard to include intersections and roundabouts

Crews will be performing mobile operations on removing and replacing roadway pavement markings

Related post

Continue in browser
To install tap Add to Home Screen
Add to Home Screen
El Paso Herald Post
Get our web app. It won't take up space on your phone.
Install
See this post in...
TxDOT, Connect10 work, closures, detours for Week of October 21
Chrome
El Paso Herald Post Download the new ElPasoHeraldPost.com app and get notifications for community news, deals and community calendar info. Your info is never shared and we would love for you to share our app with your friends!
Dismiss
Allow Notifications