Home | News | Local News | TxDoT/Go10 Closures, Detours for Week of August 26

TxDoT/Go10 Closures, Detours for Week of August 26

Here’s a look at the project closures for the week ahead.

Links to Full List of Closures:

West Area Project Closures  |  GO 10 Project Closures

Border West Expressway Closures  |  East Area Project Closures

LOCATION DURATION DESCRIPTION
I-10 West at Sunland

 

15 HOURS

Sunday, August 26

3 am to 6 pm

 

·      I-10 Westbound will close completely at Sunland Park (Exit 13).

·      The Sunland Park entrance ramp to I-10 Westbound will close.

·      Left turns onto Sunland Park Drive from the Sunland Park westbound exit ramp will not be permitted.

 

Detour:  Motorists on I-10 Westbound will exit at Sunland Park (Exit 13), then follow the detour signs to North Mesa Street (SH 20). Motorists may re-enter I-10 Westbound from the North Mesa Street entrance ramp.

 

Crews will be moving barrier walls and re-striping lanes on I-10 Westbound.

 

IMPORTANT:  After the closure lifts, motorists on I-10 Westbound should approach the North Mesa area with caution because traffic lane patterns will be changed.  

 

I-10 West at Executive Overnight

August 27-30

9 pm to 6 am nightly

 

·      I-10 Westbound will close completely at Executive Center Boulevard (Exit 16).

·      Sunland Park Drive will close in both directions at the I-10 overpass.

·      The Sunland Park flyover entrance ramp to I-10 Eastbound will close.

·      The Sunland Park entrance ramp to I-10 Westbound will close.

·      The Schuster/UTEP entrance ramp to I-10 Westbound will close.

 

Detour: Motorists on I-10 Westbound will exit at Executive Center (Exit 16), then follow the detour signs to North Mesa Street (SH 20). Motorists may re-enter I-10 Westbound from the North Mesa Street entrance ramp.

 

I-10 East at Redd 27 HOURS

Sunday, September 9 at 3 a.m. until Monday, September 10 at 6 a.m.

 

·      I-10 Eastbound will close at Redd Road (Exit 9).

·      The Redd Road entrance ramp to I-10 Eastbound will close.

 

Detour:  Motorists on I-10 Eastbound will exit at Redd Road (Exit 9), follow it to South Desert Boulevard, then follow South Desert Boulevard to North Mesa Street (SH 20). Motorists may re-enter I-10 Eastbound using the North Mesa Street entrance ramp.

 

Crews will be moving barrier walls and re-striping lanes on I-10 Eastbound.

 

IMPORTANT:  After the closure lifts, motorists on I-10 Eastbound at North Mesa Street (SH 20) will experience a change in traffic lane patterns. Please proceed cautiously.

 

Don’t forget to follow us on Twitter. Plus sign up for traffic alerts on www.drivetexas.org.

Rip-rap Repair Project

Sunday, Aug. 26 through Thursday, Aug. 30
9 p.m. to 5 a.m. (nightly)

  • I-10 westbound at Paisano – 2 right lanes closed
  • I-10 westbound Paisano exit ramp closed
  • I-10 westbound Trowbridge entrance ramp closed
  • Crews will be repairing spalled concrete pavement

 

Westway Project Phase III

Monday, Aug. 27 into Tuesday, Aug. 28
9 p.m. to 5 a.m.  (one night only)

  • Complete closure of I-10 east and westbound at the Vinton overpass
  • Crews will be placing concrete on the new turnaround bridge

 

US 54 Widening and Illumination Project

Starting Sunday, Sept. 9 and Monday, Sept. 10
9 p.m. to 5 a.m. (nightly)

  • Complete closure of US 54 southbound between Dyer exit ramp to the Ellerthorpe pedestrian bridge
  • Crews will be painting and installing clearance height signs on the pedestrian bridge

 

Tuesday, Sept. 11
9 p.m. to 5 p.m. (one night only)

  • Complete closure on US 54 southbound between the Transmountain/Woodrow Bean exit ramp to the Hondo Pass overpass
  • Detour: US 54 southbound traffic will need to exit at the Transmountain/Woodrow Bean exit ramp and re-enter at the Hondo Pass entrance ramp
  • Crews will be working on opening the new ramp and closing the existing exit ramp between Transmountain and Diana

 

Wednesday, Sept. 12
9 p.m. to 5 p.m. (one night only)

  • Complete closure on US 54 northbound between the Hondo Pass exit ramp to the Transmountain exit ramp
  • Detour: US 54 northbound traffic will need to exit at Hondo Pass and re-enter at the Transmountain/Woodrow Bean entrance ramp
  • Crews will be working on opening the new exit ramp between Diana and Transmountain

 

Mesa Park Project

Tuesday, Sept. 4
9 p.m. to 5 a.m. (one night only)

  • Complete closure on I-10 eastbound between Sunland Park to Executive
  • Detour: Eastbound traffic will need to exit at the Sunland Park exit ramp and use Mesa to enter at Executive
  • Crews will be removing traffic barriers in the area

 

Loop 375 Border Highway

Friday, Aug. 24 to Saturday Aug. 25
9 p.m. to 5 p.m. (continuous full closure)

  • Eastbound and westbound from US 54 to Oregon Street
  • Closure is needed for roadway work

 

Thursday, Sept. 6
9 p.m. to 5 a.m. (nightly full closure)

  • Eastbound and westbound from US 54 to Oregon Street
  • Closure is needed for roadway work

 

Friday, Sept. 7 to Sunday, Sept. 9
9 p.m. to 4 p.m. (nightly closure)

  • Eastbound and westbound from US 54 to Oregon Street
  • Closure is needed for roadway work

 

US 85

Friday, Aug. 24 to Saturday, Aug. 25
9 p.m. to 1 p.m. (continuous full closure)

  • Westbound and eastbound from Executive Center Boulevard to San Francisco Street
  • Closure is needed for utility work

 

Saturday, Aug. 25 to Monday, Aug. 27
1 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work

 

Friday, Sept. 7 to Monday, Sept. 10
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Spur 1966 to San Francisco Street
  • Closure is needed for cap work

 

McNutt

Friday, Aug. 24 to Monday, Aug. 27
9 p.m. to 5 a.m. (continuous full closure)

  • Westbound and eastbound from Doniphan to Brickland Street
  • Closure is needed for roadway work

 

Border West Expressway Project

Wednesday, Aug. 29
9 p.m. to 5 a.m.

  • I-10 eastbound left lane from Schuster Avenue to Executive Center Boulevard
  • Closure is needed for roadway repair

 

Doniphan Drive

Friday, Sept. 7 to Monday, Sept. 10
9 p.m. to 5 a.m. (continuous full closure)

  • Eastbound and westbound from Racetrack to Paisano
  • Closure is needed for roadway work

 

Monday, Sept. 10
9 p.m. to 5 a.m. (nightly full closure)

  • Eastbound and westbound from Racetrack to Paisano
  • Closure is needed for roadway work

 

Oregon Street

Friday, Aug. 24 to Friday, Sept. 14
5 a.m. to 4 p.m.

  • Southbound from Cesar Chavez to 7th Street
  • Closure is needed for roadway work

About Staff Report

Staff Reports are just that, Staff Reporting the news. No skew, no opinion just the news. We pride ourselves on making sure that we bring you the news as soon as it is published, submitted or sent to us. No need to have a reporter rewrite or give their opinion. The facts nothing more.

Check Also

Gallery+Story: Sun Bowl Association, CFP Foundation to Honor Local Teachers

The Sun Bowl Association, along with the College Football Playoff (CFP) Foundation, are partnering to …

728×90 pluck b
GREAT AMERICAN READ 728X90
MARIACHI 728X90
Utep 728
JustLikeThat728
Rugby 728×90