• January 27, 2022
 TxDOT work, closures, detours for Week of December 6th

Photo courtesy TxDOT

TxDOT work, closures, detours for Week of December 6th

Closure Links:

West Area Project Closures   |   I-10 Connect Closures   |   East Area Project Closures

Mesa Rehabilitation Project

Monday, Dec. 6 through Tuesday, Dec. 7

9 a.m. to 4 p.m.

  • Mesa south and northbound between Sunland Park and Baltimore mobile operation alternate lane closures.

Crews will be striping.

 

US-54 Ramp Modification Project

Highway US-54 (Patriot Freeway) Frontage Road

Continuous until further notice.

  • Gateway North between Kenworthy and Golden Sands reduced to two lanes.

Crews will be working on US-54 northbound exit ramp reconfiguration.

 

Monday, Dec. 6 and Wednesday, Dec. 8

9 a.m. to 4 p.m.

  • US-54 northbound full freeway closure at Kenworthy exit ramp.
  • Transmountain (Loop 375) northbound entrance ramp onto US-54 closed.

Crews will be working on placing concrete for drainage system.

Tuesday, Dec. 7

9 a.m. to 4 p.m.

  • US-54 northbound between Sun Valley overpass and Kenworthy exit ramp right lane closed.
  • US-54 northbound Kenworthy exit ramp closed.

Crews will be working on replacing large sign on overhead bridge.

Monday, Dec. 6 through Friday, Dec. 10

9 a.m. to 4 p.m.

  • Gateway North between Golden Sands and Sean Haggerty left lane closed.

Crews will be working on concrete demolition.

 

Replacement of E3 Rail Project

Continuous until further notice.

  • I-10 westbound between Schuster and Asarco bridge right lane closed.

Crews will be working on installing metal beam guard fence and concrete barrier.

  • I-10 eastbound between Asarco bridge and Schuster shoulder closed.

Crews will be working on concrete barrier.

Sunday, Dec. 5 at 9 a.m. through Monday, Dec. 6 at 5 a.m. (24 hour closure)

  • I-10 westbound between Schuster and Executive closed.
  • Detour: Exit at Schuster, right onto Spur 1966, and right onto Loop 375 westbound.

Crews will be working on traffic switch and moving concrete barrier.

 

Guardrail Repair Project

Monday, Dec. 6

9 a.m. to 4 p.m.

  • I-10 westbound between Thorn and Redd right lane closed.
  • Loop 375 (Border Highway) westbound between Executive and Doniphan right lane closed.

Tuesday, Dec. 7

9 a.m. to 4 p.m.

  • I-10 westbound between Artcraft and Transmountain left lane closed.

Wednesday, Dec. 8

9 a.m. to 4 p.m.

  • US-54 southbound between Trowbridge and Montana left and right lanes closed.
  • Gateway South at Pershing on-ramp closed.

Thursday, Dec. 9

9 a.m. to 4 p.m.

  • I-10 eastbound between Mesa and Resler left lane closed.

Friday, Dec. 10

9 a.m. to 4 p.m.

  • Spur 601 eastbound between Gateway North and Chaffee right lane closed.

Maintenance

Monday, Dec. 6 through Friday, Dec. 10

9 a.m. to 3 p.m.

    • US-54 southbound at Montana exit ramp closed.
    • I-10 east and westbound at Geronimo exit and entrance ramps closed.
    • I-10 eastbound at Buffalo Soldier exit ramp closed.
  • I-10 east and westbound at Airway exit and entrance ramps closed.
  • I-10 westbound at Hawkins exit ramp closed.
  • Gateway east and westbound between Raynolds and McRae alternate lane closures.

Crews will be cleaning.

I-10 Connect

Monday, December 6, Tuesday, December 7, and Friday, December 10, 9 a.m. to 4 p.m.

  • A full closure of Ramp P, which connects US 54 southbound to Loop 375 westbound, will be in place.
  • On Friday, December 10, only: a full closure of Ramp Y, which connects US 62 to Loop 375 eastbound, will be in place.

Crews will be repairing a bridge joint.

Monday, December 13, through Thursday, December 16, 9 a.m. to 4 p.m.

  • A full closure of Ramp P, which connects US 54 southbound to Loop 375 westbound, will be in place.
  • A full closure of Ramp Y, which connects US 62 to Loop 375 eastbound, will be in place.

Crews will be repairing a bridge joint.

 

 

Loop 375 Frontage Road Project

Monday, Dec. 6 through Friday, Dec. 10

Daily, from 9 a.m. until 4 p.m. and

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • S Americas Avenue (frontage roads) southbound and northbound alternating lane closures between Gateway Boulevard East and North Loop Drive
  • S Americas Avenue traffic may be reduced to one lane in some areas

Crews will be working on miscellaneous items

 

Monday, Dec. 6 through Thursday, Dec. 9

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 northbound exit ramp closed at Pan American Drive (Exit 47)
  • Loop 375 northbound entrance ramp closed at Pan American Drive
  • Loop 375 southbound exit ramp closed at Alameda Avenue/Socorro Road (Exit 47)
  • Loop 375 southbound exit ramp closed at Pan American Drive (Exit 48A)
  • Loop 375 northbound entrance ramp closed at Pan American Drive
  • Traffic will detour to next available ramp

Crews will be working on miscellaneous items

 

Loop 375 Widening Project

Monday, Dec. 6 through Thursday, Dec. 9

Daily, from 9 a.m. until 4 p.m.

    • Joe Battle Boulevard (frontage road) northbound alternating left lane and right lane closures between Zaragoza Road and Alameda Avenue
    • Joe Battle Boulevard (frontage road) southbound right lane closured between North Loop Drive and  UPRR turnaround
  • Joe Battle Boulevard (frontage road) southbound right shoulder closure between Zaragoza Road and Loop 375 Zaragoza entrance ramp
  • Joe Battle Boulevard (frontage road) southbound traffic may be reduced in some area

Crews will be installing electrical conduit

 

Monday, Dec. 6 through Thursday, Dec. 9

Daily, from 9 a.m. until 4 a.m.

  • Loop 375 southbound shoulder at North Loop Drive entrance ramp will be closed

Crews will be working on electrical conduit

Monday, Dec. 6 through Thursday, Dec. 9 (complete closure)

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 southbound complete lane closure between Pellicano Drive and North Loop Drive
  • Loop 375 southbound traffic will exit at Pellicano Drive and reenter at North Loop Drive

Crews will be placing concrete pavement and erecting high mast illumination

Thursday, Dec. 9 (complete closure)

9 a.m. until 4 a.m.

  • S Americas Avenue southbound frontage road bridge closed between North Loop Drive to Alameda Avenue
  • Traffic will detour southbound to Pan American Drive

Crews will be erecting high mast illumination

District Wide Striping Project

Sunday, Dec. 5 through Thursday, Dec. 9

Nightly, from 9 p.m. until 6 a.m. and continuous until further notice (overnight)

  • Alameda Avenue (SH 20) eastbound and westbound multiple and alternating lane closures between Texas Avenue (US 62) and Paisano Drive (US 62) to include intersections and roundabouts

Crews will be performing mobile operations on removing and replacing roadway pavement markings

 

Sunday, Dec. 5 through Thursday, Dec. 9

Nightly, from 9 p.m. until 6 a.m. and continuous until further notice (overnight)

  • Paisano Drive (US 62) eastbound and westbound multiple and alternating lane closures between Montana Avenue (US 62/180) to Gateway North Boulevard to include intersections and roundabouts

Crews will be performing mobile operations on removing and replacing roadway pavement markings

 

Maintenance Closures

Deceleration Lane and Driveway Entrance

Monday, Dec. 6 through Friday, Dec. 10

Continuous closure until further notice

  • Montana Avenue (US 62/180) eastbound right lane closure between George Dieter Drive and Lee Trevino Drive

Closure is necessary for construction of new driveway entrance, curb and gutter

Related post