  • Transmountain (Loop 375) east and westbound between US-54 and Tom Mays State Park alternate lane closures including shoulders.  Bike lane closed.

Crews will be working on cable barrier and mow strip.

  • Transmountain east and westbound between Resler and Summit inside shoulders closed.

Crews will be working on median drainage riprap.

  • Transmountain (Loop 375) east and westbound between Mile Marker 18 and 14 inside shoulders closed.

Crews will be working on median drainage.

Monday, Nov. 22 through Tuesday, Nov. 23

9 a.m. to 4 p.m.

  • Transmountain (Loop 375) westbound between US-54 southbound and Resler alternate lane closures including shoulders.

Crews will be installing cable barrier, guardrail, mow strip, roadway markings, and sign installation.

  • Transmountain (Loop 375) east and westbound between Resler and I-10 alternate lane closures.

Crews will be working on installation of metal beam guard fence.

Mesa Rehabilitation Project

Monday, Nov. 22 through Tuesday, Nov. 23

9 a.m. to 4 p.m.

  • Mesa south and northbound between Sunland Park and Baltimore mobile operation alternate lane closures.

Crews will be striping the roadway.

US-54 Ramp Modification Project

Highway US-54 (Patriot Freeway) Frontage Road

Sunday, Nov. 21 through Monday, Nov. 22

Nightly, 9 p.m. to 3 p.m. (18-hr. closure)

  • US-54 northbound at Kenworthy exit ramp full freeway closure.
  • Transmountain (Loop 375) entrance ramp to US-54 closed.
  • Gateway North between Pleasant Sands and Sean Haggerty left lane closed.

Crews will be working on relocating portable concrete traffic barrier and roadway pavement markings.

Loop 375 Highway Rehabilitation Project

Monday, Nov. 22 through Tuesday, Nov. 23

6 a.m. to 6 p.m.

  • Loop 375 Cesar Chavez Border Highway eastbound between Campbell and Fonseca reduced to one lane.
  • Cesar Chavez Border Highway eastbound Exit 58 closed.
  • Paisano entrance ramp to Loop 375 eastbound closed.
  • Patriot Freeway (US-54) entrance ramp to Loop 375 eastbound closed.

Crews will be working on roadway base repairs.

City-Wide OSB Project

Tuesday, Nov.23

Night, 9 p.m. to 6 a.m.

  • I-10 east and westbound between Zaragoza and Loop 375 closed.

Crews will be moving concrete barriers to open lanes.

Guardrail Repair Project

Sunday, Nov. 21

7 a.m. to 4 p.m.

  • I-10 westbound between Raynolds and Copia right lane and Ramp A closed.

Monday, Nov. 22

9 a.m. to 4 p.m.

  • US-85 eastbound between Sunland Park and Crockett left lane and I-10 east on-ramp closed.

Tuesday, Nov. 23

9 a.m. to 4 p.m.

  • I-10 westbound between Artcraft and Transmountain left lane closed.

Wednesday, Nov. 24

9 a.m. to 4 p.m.

  • East Missouri between Magnolia and Walnut left lane closed.

Loop 375 (Border Highway) Wrong Way Driver Construction Project

Sunday, Nov 21

9 p.m. to 5 a.m.

  • Loop 375 westbound between Paisano exit an Spur 1966.
  • Detour through Paisano and re-enter at Spur 1966.

Crews will be modifying construction concrete barrier.

Miscellaneous Concrete

Monday, Nov 22

9 a.m. to 4 p.m.

  • I-10 westbound between Redd and Artcraft left lane closed.

Crews will be repairing concrete barriers.

Montana Frontage Road Project

Monday, Nov. 15 through Friday, Nov. 19

Daily, from 9 a.m. until 4 p.m.

  • Joe Battle Boulevard (westbound frontage road) right shoulder and right lane closure between Loop 375 and Lee Boulevard
  • Traffic traveling westbound on frontage road will merge to center and left lanes

Crews will be working on illumination

Monday, Nov. 15 through Friday, Nov. 19

Daily, from 8 a.m. until 4 p.m.

  • Montana Avenue (US 62/180) eastbound right lane and right shoulder closure between Smoke Signal Drive to east of George Dieter Drive
  • Traffic traveling eastbound will turn right at George Dieter Drive right lane and not the right turn lane

Crews will be working on illumination and high mast lighting

Sunday, Nov. 21 through Monday, Nov. 22

Nightly, from 9 p.m. until 5 a.m.

    • Montana Avenue (US 62/180) eastbound (frontage road) left shoulder closure at Lee Trevino Drive
  • Montana Avenue (US 62/180) westbound (frontage road) multiple left lane closures at Lee Trevino Drive
  • Montana Avenue (US 62/180) westbound (frontage road) traffic turning south on Lee Trevino Drive will continue west and detour at N Yarbrough Drive turnaround
  • Lee Trevino Drive northbound traffic will turn right on Montana Avenue (US 62/180) and detour at George Dieter Drive turnaround

Crews will be working on illumination

Tuesday, Nov. 23

Daily, from 8 a.m. until 12 p.m.

  • Montana Avenue (US 62/180) eastbound at N Yarbrough Drive closed
  • Traffic traveling eastbound will need to follow EPPD officer’s direction while traffic lights are dark for three hours

Crews will be working on transferring power source

Loop 375 Frontage Road Project

Monday, Nov. 15 through Thursday, Nov. 18

Daily, from 9 a.m. until 4 p.m. and

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • S Americas Avenue (frontage roads) southbound and northbound alternating lane closures between Gateway Boulevard East and North Loop Drive
  • S Americas Avenue traffic may be reduced to one lane in some areas

Crews will be working on miscellaneous items

Monday, Nov. 15 through Thursday, Nov. 18

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 northbound exit ramp closed at Pan American Drive (Exit 47)
  • Loop 375 northbound entrance ramp closed at Pan American Drive
  • Loop 375 southbound exit ramp closed at Alameda Avenue/Socorro Road (Exit 47)
  • Loop 375 southbound exit ramp closed at Pan American Drive (Exit 48A)
  • Loop 375 northbound entrance ramp closed at Pan American Drive
  • Traffic will detour to next available ramp

Crews will be working on miscellaneous items

Monday, Nov. 15 through Friday, Nov. 18 (be prepared to stop)

Daily, from 9 a.m. until 4 p.m. and continuous until further notice

  • South Americas Avenue (frontage road) southbound to northbound turnaround will be occasionally blocked between North Loop Drive and Union Pacific Railroad (UPRR) tracks
  • South Americas Avenue southbound to northbound traffic will remain open and be flagged through work zone

Crews will be installing electrical conduit and hauling materials

Loop 375 Widening Project

Monday, Nov. 15 (complete closure)

Nightly, from 9 p.m. until 5 a.m. (overnight)

  • Loop 375 southbound complete lane closure between Pellicano Drive and Bob Hope Drive
  • Loop 375 southbound traffic will exit at Pellicano Drive and reenter at Bob Hope Drive

Crews will be placing concrete pavement

Monday, Nov. 15 through Thursday, Nov. 18

Daily, from 9 a.m. until 4 p.m.

  • Joe Battle Boulevard (frontage road) northbound alternating left lane and right lane closures between Zaragoza Road and Alameda Avenue
  • Joe Battle Boulevard (frontage road) southbound right lane closured between North Loop Drive and Zaragoza Road and UPRR turnaround
  • Joe Battle Boulevard (frontage road) southbound right shoulder closure between Zaragoza Road and Loop 375 Zaragoza entrance ramp
  • Joe Battle Boulevard (frontage road) southbound traffic may be reduced in some area

Crews will be installing electrical conduit

Thursday, Nov. 18

Daily, from 9 a.m. until 4 a.m.

  • Joe Battle Boulevard (frontage road) northbound right lane closure between S Americas
    Avenue and Joe Rodriguez Drive
  • Loop 375 southbound traffic will travel along frontage road and reenter at Bob Hope Drive

Crews will be installing High Mast Lighting

I-10 Connect

Sunday, November 21, and Monday, November 22, 8 p.m. to 6 a.m.

  • A full closure of Ramp N, which connects Loop 375 eastbound to I-110 northbound, will be in place.
  • Crews will be repairing a bridge joint.

Sunday, November 21, and Monday, November 22, 9 p.m. to 5 a.m.

  • A full closure of the Juarez exit will be in place. No Detour. No access to Juarez. Full closure on Ramp F, which connects I-10 westbound to I-110 southbound, at Bridge 2 and Ramp A, which connects I-10 westbound to US 54 northbound.
  • A full closure of Bridge 15 at Ramp D, which connects US 54 southbound to I-10 eastbound, will be in place. A right lane closure will be in place at the gore of Bridge 15.
  • A full closure of Ramp H, which connects I-10 eastbound to US 54 northbound, will be in place. US 54 northbound and southbound traffic will proceed to Trowbridge Drive and use turnaround to get to I-10 westbound and then take Ramp A to US 54 northbound, use the Pershing Drive turnaround to get to US 54 southbound.

Tuesday, November 23, 9 p.m. to 5 a.m.

    • A full closure of US 54 northbound at Loop 375 will be in place. Ramp N, which connects Loop 375 eastbound to I-110 northbound, will be closed to all traffic.
    • DETOUR: Traffic should take Exit 56 (Fonseca Drive), use the turnaround and continue on Loop 375 westbound to Ramp R, which connects Loop 375 westbound to US 62.
  • Ramp O, which connects Loop 375 westbound to US 54 northbound, will be closed to all traffic.
  • DETOUR: Traffic should use Ramp R, which connects Loop 375 westbound to US 62.
    • Ramp T, which connects Gateway North to US 54 northbound, and I-110 northbound Entrance Ramp, will be closed to all traffic. Closure of I-110 northbound entrance ramp to I-10 eastbound will be in place.
  • DETOUR: Traffic should take Alameda Avenue, turn left at Raynolds Street and continue on to I-10.
  • Traffic on I-110 northbound will be forced to the left lane and leave the Bridge of the Americas to the north. Traffic will be directed to I-10 eastbound.

Crews will be performing striping work and EX6 installation.

Tuesday, November 23, and Wednesday, November 24, 8 p.m. to 6 a.m.

  • A full closure of Ramp P, which connects US 54 southbound to Loop 375 westbound, will be in place.

Crews will be repairing a bridge joint.